Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1039
Show all pagesFor Inspector Component No. Component Name Inspection Item and Inspection Item No. 4 Excessive or overgrown vegetation blocking access to the basin For Maintenance Crew Result Y__ N__ Preventative / Corrective Maintenance Actions Clear, trim, or prune the vegetation to allow access for inspection and maintenance Work Order #________ Note: Follow Up Items (Component No. / Inspection Item No.): Associated Work Orders: # ______, # ______, # ______, # ______, # _____ ________________________ Inspector Name ______________________ ________________ Signature Date Report issues to the local authority and mosquito commission as required by local ordinances and regulatory authorities. File this checklist in the Maintenance Log after performing maintenance. April 2015 Bioretention System Page 43/49
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes