J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1059

Show all pages
Page 1059

August 8, 2022 File No. 26.0092704.00 PSE&G – West Orange, NJ Page 2 Proactive by Design Purpose and Scope of Work The purpose of our services was to: 1) explore the subsurface soil and groundwater conditions by performance of the five (5) requested test borings and three (3) test pits; 2) estimate the relevant geotechnical engineering properties of the encountered materials; 3) evaluate the site foundation requirements considering the anticipated construction and encountered subsurface conditions; 4) recommend appropriate types of foundations for support of the proposed equipment, and provide geotechnical-related foundation design and installation criteria, including an estimate of the Site Class as defined by the International Building Code 2018, New Jersey Edition, for seismic design purposes; 5) perform field permeability/percolation tests and/or collect tube samples for laboratory permeability testing at each test pit, if appropriate; 6) obtain samples from depths of approximately 3 and 8 feet from the three test pit locations and submit them to Geotherm USA for thermal resistivity testing; 7) arrange for a field resistivity survey to be performed at locations to be identified in the future; and 8) discuss appropriate earthwork considerations consistent with the proposed construction and encountered subsurface conditions. To accomplish these purposes, a subsurface exploration program consisting of five supervised test borings and three supervised test pits was performed. Prior to advancing the test borings, the areas were initially scanned with ground-penetrating radar. The boring locations were then hand excavated to about 3 feet prior to the start of sampling. The test borings were advanced through the hand excavations using mud-rotary drilling equipment mounted on an ATV drill rig and extended to depths of approximately 15 to 30 feet below the existing ground surface (bgs) at which point refusal was An Equal Opportunity Employer M/F/V/H

File revisions (1)