J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1111
Show all pagesThis report has been prepared in accordance with generally accepted soils and foundation engineering practices for the exclusive use of PSE&G for specific application to the design of the proposed West Orange Switching Station Lifecycle Project. No other warranty, expressed or implied, is made. This report may be referred to in the project specifications for general information purposes only, but should not be used as the technical specifications for the work, as it was prepared for design purposes exclusively. C. Reinterpretation of Recommendations Change in Location or Nature of Facilities: In the event that any changes in the nature, design or location of the facilities are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and conclusions of this report modified or verified in writing. Changed Conditions During Construction: The analyses and recommendations submitted in this report are based in part upon the data obtained from five widely-spaced test borings and three test pit excavations performed for this study. The nature and extent of variations between the explorations may not become evident until construction. If variations then appear evident, it will be necessary to reevaluate the recommendations of this report. Changes in State-of-the-Art: The conclusions and recommendations contained in this report are based upon the applicable standards of our profession at the time this report was prepared. D. Use of Report by Prospective Bidders This soil and foundation engineering report was prepared for the project by GZA GeoEnvironmental, Inc. (GZA) for design purposes and may not be sufficient to prepare an accurate bid. Contractors utilizing the information in the report should do so with the express understanding that its scope was developed to address design considerations. Prospective bidders should obtain the owner's permission to perform whatever additional explorations or data gathering they deem necessary to prepare their bid accurately. E. Construction Observation We recommend that GZA be retained to provide on-site soils engineering services during the earthwork construction and foundation phases of the work. This is to observe compliance with the design concepts and to allow changes in the event that subsurface conditions differ from those anticipated prior to the
uction and foundation phases of the work. This is to observe compliance with the design concepts and to allow changes in the event that subsurface conditions differ from those anticipated prior to the start of construction.
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes