Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1116

Show all pages
Page 1116

PSE&G West Orange Switching Station West Orange, NJ Stormwater Management Report Pleasant Avenue, a smaller access road off the same road for PSE&G employees at the southern end, and an access road off Prospect Avenue. Table I-1 provides a cross reference listing for the design plans and specifications for the West Orange Switching Station. Table 1-1 List of Drawings for the Proposed West Orange Switching Station Expansion Drawing No. 331307 331308 331309 331310 331311 331312 331313 331314 331315 331318 331320 331450 331456 331457 331458 331459 331460 334554 341555 341558 341559 341560 341561 341562 341602 TRC Engineers, Inc. Drawing Title Bus Plan Sections and Details Grading Plan Grading Details Soil Erosion & Sediment Control Plan Soil Erosion & Sediment Control Notes and Details Plan View Site Details Foundation Plan Sections & Details - Sheet 7 Removal Plan Lighting Distribution Plan Sections & Details - Sheet 2 Sections & Details - Sheet 3 Sections & Details - Sheet 4 Sections & Details - Sheet 5 Sections & Details - Sheet 6 Lighting Distribution Layout Gate and Station Road Location Plan Fence Modifications Double Swing Gate & Fence Details Drainage Details Drainage Details - Aqua Swirl Concentrator Drainage Details - Aqua Filter Top Plan 2 March 2012

File revisions (1)