Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1203
Show all pagesSUBSURFACE INVESTIGATION 30355 13-6-202 C Project No.: Specification No.: Revision No.: r EQUIPMENT / STRUCTURE LOADS Equipment Fz Fx Structure kips kips kips kip-ft Frame (A or H) 50 20 1 500 1 1 My | Fy Mz i Mx kip-ft kip-ft 10 - 1 ¥ 2 Control Building 100 9.6 24 3 Capacitor Bank 6 2 • 4 Circuit Breaker 5 2 15 * • 5 CCVT 6 2 32 -«■ to 6 Disconnect Switch 5 2 1 24 6 - 7 GIS Building Wall 8 1.5 1.5 24 - »• 8 Ground Switch 5 1 ■» 10 - 9 Lightning Mast 3 2 - 200 - -■ 10 Low Bus 2 1 1 35 15 *• 11 High Bus 5 2 2 70 30 12 Pothead 10 4 1 80 15 - 13 Sound Wall 0.1 1.5 - 15 - - 14 Surge Arrester 2 1 1 7 1 - 15 Transformer - HV 500 100 - - - - 16 Transformer-LV 250 50 - ^' - - 25 * NOTES: 1. The load3 are preliminary, approximate, estimated, and do not include foundation concrete weight. These loads are unfactored for service condition. Final loads will vary based on actual equipment and structural configurations. 2. Coordinate Z-axis is vertical, X-axis is transverse and Y-axis Is longitudinal. Forces Fx and Fy. and Moments Mx and My shall be assumed to act simultaneously. Moment Mz about vertical axis will cause torsion. Force Fz is primarily weight of the equipment or structure. 3. Transformer weight assumed to be supported by 12 feet wide and 15 feet long block foundation. 4. Control building assumed supported on 16 feet wide by 40 feet tong pad. 5. GIS building wall and sound wall load unit Is kips per linear foot. Pane D 2 ] PLATE 11
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes