Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1203

Show all pages
Page 1203

SUBSURFACE INVESTIGATION 30355 13-6-202 C Project No.: Specification No.: Revision No.: r EQUIPMENT / STRUCTURE LOADS Equipment Fz Fx Structure kips kips kips kip-ft Frame (A or H) 50 20 1 500 1 1 My | Fy Mz i Mx kip-ft kip-ft 10 - 1 ¥ 2 Control Building 100 9.6 24 3 Capacitor Bank 6 2 • 4 Circuit Breaker 5 2 15 * • 5 CCVT 6 2 32 -«■ to 6 Disconnect Switch 5 2 1 24 6 - 7 GIS Building Wall 8 1.5 1.5 24 - »• 8 Ground Switch 5 1 ■» 10 - 9 Lightning Mast 3 2 - 200 - -■ 10 Low Bus 2 1 1 35 15 *• 11 High Bus 5 2 2 70 30 12 Pothead 10 4 1 80 15 - 13 Sound Wall 0.1 1.5 - 15 - - 14 Surge Arrester 2 1 1 7 1 - 15 Transformer - HV 500 100 - - - - 16 Transformer-LV 250 50 - ^' - - 25 * NOTES: 1. The load3 are preliminary, approximate, estimated, and do not include foundation concrete weight. These loads are unfactored for service condition. Final loads will vary based on actual equipment and structural configurations. 2. Coordinate Z-axis is vertical, X-axis is transverse and Y-axis Is longitudinal. Forces Fx and Fy. and Moments Mx and My shall be assumed to act simultaneously. Moment Mz about vertical axis will cause torsion. Force Fz is primarily weight of the equipment or structure. 3. Transformer weight assumed to be supported by 12 feet wide and 15 feet long block foundation. 4. Control building assumed supported on 16 feet wide by 40 feet tong pad. 5. GIS building wall and sound wall load unit Is kips per linear foot. Pane D 2 ] PLATE 11

File revisions (1)