Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1205
Show all pagesr Ok CO o oz O 5 a. a < 3 TI-1 PLANTER *0 % MT. PLEASANT AVENUE NOTES: TP -1 NUMBER AND APPROXIMATE LOCATION OF TEST PIT PERFORMED FOR THIS STUDY 1. Thh drawing Is port of Ueflck-Tulty and Associate, P.C. Report Ho. 5165-078*10 and should bo read logsthsr with the report tor complete evaluation. 2. General layout was obtained tram a drawing prepared by PSEAG Engineering, entitled ’Plant Roadway Jt Track Layout,* dated 2/28/03. scale l*»30\ PLOT PLAN MEUCK-TULLY AND ASSOCIATES, P.C. Geotechnical Engineers PROPOSED BULK NITROGEN SYSTEM k Environmental Consultants 117 Canal Road South Bound Brook, New Jersey 08880 (732) 356-3400 JOB NO. circ 5165—078*1 G FILE NO. 14069 WEST ORANGE, NEW JERSEY PSE&G SWITCHING STATION OR. BY CRP CHK. BY PR DATE 9-18-03 SCALE PLATE 1**50* 2
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes