Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
Preserved file SHA-256
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 13
Show all pagesStormwater Management Plan Revision 0 Site Conditions which are shown in Hydrologic Soil Group D on a USDA Soil Texture Triangle, in accordance with Chapter 12 of the BMP Manual. The soil map, soil descriptions and ratings can be found in Appendix F. 1.5 Floodplain As depicted on FEMA Map Number 34013C0092F (effective date June 4, 2007), the project site is located within a FEMA Zone X, area of minimal flood hazard. The Flood Insurance Rate Map (FIRM) can be found in Appendix F . Public Service Electric & Gas Company 1-3 Burns & McDonnell
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes