Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1313
Show all pagesPost Development West Orange A_03 01 12 Printed Prepared by TRC Engineers, Inc. HydroCAD® 9.10 s/n 06401 © 2009 HydroCAD Software Solutions LLC 3/14/2012 Page 2 Pipe Listing (all nodes) Line# Node In-Invert Out-Invert Length Slope Number (feet) (feet) (feet) (ft/ft) n Diam/Width Height Fill (inches) (inches) (inches) 1 3A 0.00 0.00 50.0 0.0200 0.020 15.0 0.0 0.0 2 Basinl 601.00 600.00 140.0 0.0071 0.020 15.0 0.0 0.0 3 Basin2 594.00 592.00 78.0 0.0256 0.020 12.0 0.0 0.0 0.020 0.0 4 Basin3 590.50 589.50 47.0 0.0213 15.0 0.0 5 Basin4 585.00 584.00 37.0 0.0270 0.020 15.0 0.0 0.0 6 Basin5 580.50 580.00 65.0 0.0077 0.020 15.0 0.0 0.0
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes