Post-Developed (O-1) West Orange HydroCAD_Pre NOAA 24-hr D 2-Year_Future Rainfall=4.07", P2=4.07" Prepared by Burns & McDonnell Printed 5/13/2024 Page 16 HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Pond 22P: O-1 Inflow Area = Inflow = Primary = 1.685 ac, 5.92% Impervious, Inflow Depth > 2.21" for 2-Year_Future event 3.49 cfs @ 12.19 hrs, Volume= 0.310 af 3.49 cfs @ 12.19 hrs, Volume= 0.310 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Pond 22P: O-1 Hydrograph Inflow Primary 3.49 cfs Inflow Area=1.685 ac 3.49 cfs Flow (cfs) 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24