Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1330

Show all pages
Page 1330

Post Development West Orange A_03 01 12 Prepared by TRC Engineers, Inc. Type III 24-hr 10 yr Rainfall=5.21" Printed 3/14/2012 HydroCAD® 9.10 s/n 06401 © 2009 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 1A: 1A Runoff = 1.05 cfs@ 12.09 hrs, Volume= Runoff by SCS TR-20 method, Type III 24-hr 10 yr Rainfall=5.21" UH=SCS, Split 0.077 af, Depth= 3.24" Pervious/lmperv., Time Span= 0.00-30.00 hrs, Area (sf) CN Description * 2,107 10,364 98 78 Impervious, HSG D Meadow, non-grazed, HSG D 12,471 10,364 2,107 81 78 98 Weighted Average 83.10% Pervious Area 16.90% Impervious Area Tc (min) Length (feet) Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 4.3 70 0.1860 0.27 Sheet Flow, 0.4 70 0.0429 3.11 Shallow Concentrated Flow, 4.7 140 Total, Grass: Dense n= 0.240 P2= 3.42" Grassed Waterway Kv= 15.0 fps Increased to minimum Tc = 6.0 min Subcatchment 1A: 1A Hydrograph 1.05 cfs 7 1- X y / / o-f< o Type III 24-hr 10 yr : Rainfall=5.21" Runoff Area=12,471 sf Runoff Volume=0.077 af Runoff Depth=3.24" Flow Length=140' Tc=6.0 min CN=78/98 i i i 1*1 ii i|'n ii p iii/'ii u |'i, ii | ( i i i ipi i i p ii i |"i i ii (1 ii i|*n n |m i|*u ii |¥ 34 56 78 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) dt= 0.01 hrs

File revisions (1)