Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1379
Show all pagesPost Development West Orange B_03 01 12 Prepared by TRC Engineers, Inc. HydroCAD® 9.10 s/n 06401 © 2009 HydroCAD Software Solutions LLC Printed Page 2 3/14/2012 Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Fill (inches) 1 2 3 4 5 6 7 8 9 10 MH-1 MH-2 MH-3 MH-4 MH-5 MH-6 MH-7 MH-A MH-B MH-C 603.20 604.00 603.20 602.20 599.90 597.60 596.50 599.00 598.00 597.00 602.20 603.20 602.20 599.90 597.60 596.50 592.80 598.00 597.00 592.70 15.0 34.0 50.0 85.0 66.0 45.0 360.0 74.0 92.0 205.0 0.0667 0.0235 0.0200 0.0271 0.0348 0.0244 0.0103 0.0135 0.0109 0.0210 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 12.0 12.0 12.0 18.0 18.0 18.0 30.0 12.0 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes