Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 141

Show all pages
Page 141

Post-Developed (O-1) West Orange HydroCAD_Pre NOAA 24-hr D 10-Year_Future Rainfall=6.36", P2=4.07" Prepared by Burns & McDonnell Printed 5/13/2024 Page 24 HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.0100 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 24S: PO-DA 7 Pond 22P: O-1 Runoff Area=73,407 sf 5.92% Impervious Runoff Depth>4.22" Flow Length=439' Tc=11.6 min CN=WQ Runoff=6.61 cfs 0.592 af Inflow=6.61 cfs 0.592 af Primary=6.61 cfs 0.592 af Total Runoff Area = 1.685 ac Runoff Volume = 0.592 af Average Runoff Depth = 4.22" 94.08% Pervious = 1.585 ac 5.92% Impervious = 0.100 ac

File revisions (1)