Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1480
Show all pagesPost Development West Orange C_03 01 12 Type III 24-hr 10yr Rainfall=5.21" Prepared by TRC Engineers, Inc. HydroCAD® 9.10 s/n 06401 © 2009 HydroCAD Software Solutions LLC Printed 3/14/2012 Page 25 Summary for Subcatchment 2: PO-DA 2 Runoff = 1.66 cfs@ 12.24 hrs, Volume= 0.166 af, Depth= 2.98" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/lmperv., Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10 yr Rainfall=5.21" ★ * * Area (sf) CN Description 0 98 Impervious, HSG D 0 98 Gravel road, HSG D 80 Grass, Good, HSG D 9,261 78 Meadow, non-grazed, HSG D 19.890 29,151 79 Weighted Average 29,151 79 100.00% Pervious Area Tc (min) 12.1 Length (feet) 120 Slope (ft/ft) 0.0400 0.3 75 0.0600 3.67 Shallow Concentrated Flow, 1.9 140 0.0070 1.25 Shallow Concentrated Flow, 1.2 130 0.0150 1.84 1.7 360 0.0540 3.49 0.4 190 0.0100 7.20 Velocity Capacity (ft/sec) (cfs) 0.17 Description Sheet Flow, Grass: Dense n= 0.240 P2= 3.42" Grassed Waterway Kv= 15.0 fps Grassed Waterway Kv= 15.0 fps Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 22.62 Pipe Channel, Culvert to Discharge 24.0" Round Area=3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 17.6 1,015 Total
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes