Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1552

Show all pages
Page 1552

lUf HDPE AquaShield™ Products Installation Throughout this section and in our individual product specifications, references will be made to specific ASTM standards for the manufacturing and the installation of the AquaShield™ products. Quality control is a high priority within AquaShield™. That is why all of the patented products are fabricated, inspected and tested before leaving for the job site. The AquaShield™ systems are a modular design and constructed to facilitate the installation process. Because each system is constructed of IHH High-Density Polyethylene (HDPE), even the largest units can be off-loaded and installed without the use of a crane or other special lifting equipment. Lifting cables are provided on each Aqua-Swirl™ and Aqua-Filter™, allowing an excavator or backhoe to maneuver and position the system. Furthermore, the systems can be stored on the job site following off­ loading to accommodate changing schedules. Stub-outs for the inlet and outlet are part of the modular design of the Aqua-Swirl™ and Aqua-Filter™, which allows the contractor to attach the pipes to the Lifting cable for installation inlet and outlet of the Stormwater Treatment System with couplings. Typically, an AquaShield™ representative is present on-site to assist in the installation process. Ml ' ' », Both the Aqua-Swirl™ and the Aqua-Filter™ come with risers and custom manhole frames and covers. Delivery is typically less than four weeks from final approval of shop drawings.

File revisions (1)