Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1568
Show all pagesDuring Construction Inspect the Aqua-Filter™ every three months and clean the system as needed. The Aqua-Filter™ should be Inspected and cleaned at the end of construction regardless of whether it has reached its sediment or oil storage capacity. First Year Post-Construction Inspect the Aqua-Filter™ every three months and clean the system as needed. Inspect and dean the system once annually regardless of whether it has reached its sediment or floatable pollutant storage capacity. Second and Subsequent Years Post-Construction If the Aqua-Filter™ did not reach full sediment or floatable pollutant capacity in the First Year Post-Construction, the system can be inspected and cleaned once annually. If the Aqua-Filter™ reached fuK sediment or floatable pollutant capacity in less than 12 months In the First Year Post-Construction, the system should be inspected once every six months and deaned as needed. The Aqua-Filter™ should be cleaned annually regardless of whether it reaches its sediment or floatable pollutant capacity. Bypass Structures Bypass structures should be Inspected whenever the Aqua-Filter™ Is Inspected and maintained as needed, Company Name; Street Address: City. State, Zip: Contact: Office Phone: Mobile Phone: Pager: Date of cleaning: _ (Next Inspection should be 3 months from this date for tha first year). Time of cleaning: Date of next inspection: Floatable debris present (Y/N)? Oil present (Y/N)?_ Oil depth (inches): Aqua-Filter™ I and M Manual Page 3
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes