Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1570

Show all pages
Page 1570

Aqua-Filter™ CE SCHEDULf: Date Construction Started: Date Construction Ended: MMMi 10 Activity _ Inspect and Clean as Needed Inspect Bypass Structures (if appicable) and Maintain As Needed 12 11 X X X X X X X X 9 10 11 12 Clean System'' * The Aqua-Filter™ should be cleaned once a year regardless of whether it has reached full pollutant storage capacity. In addition, the system should be cleaned at the end of construction regardless of whether it has reach full pollutant storage capacity. aemajBMi»gHt Month Activity 1 2 Imped and Clean as Needed Inspect Bypass Structures (if applicable) and Maintain 3 4 5 6 7 8 X X X X X X X X As Needed dean System* X* ' The Aqua-Filter™ should be cleaned once a year regardless of whether it has reached full pollutant storage capacity. id Subset Iffjpj Activity 1 2 3 4 5 fears Post’-ConstrifctrorK' Month 6 7 8 Inspect and Clean as lanniii 9 WSMSMIjigglf 10 11 9SBM l 12 | X* Needed* Inspect Bypass Structures X* (ir applicable) and Mainlain As Needed Clean System* X‘ *lf the Aqua-Filter™ did not reach full sediment or floatable pollutant capacity in the First Year Post-Construction, the system can be inspected and cleaned once annually. If the Aqua-Filter™ reached full sediment or floatable pollutant capacity in less than 12 months in the First Year Post-Construction, the system should be inspected once every six months (more frequently if past history warrants) and cleaned as needed. The Aqua-Filter™ should be cleaned annually regardless of whether it reaches its sediment or floatable pollutant capacity. Aqua-Filter™ I and M Manual Page 5

File revisions (1)