Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 173

Show all pages
Page 173

Post-Developed (O-2) West Orange HydroCAD_Pre NOAA 24-hr D 2-Year_Future Rainfall=4.07", P2=4.07" Prepared by Burns & McDonnell Printed 5/13/2024 Page 12 HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.0100 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 21S: PO-DA 1 Pond 21P: O-2 Runoff Area=52,807 sf 14.94% Impervious Runoff Depth>2.15" Flow Length=341' Tc=3.7 min CN=WQ Runoff=3.19 cfs 0.217 af Inflow=3.19 cfs 0.217 af Primary=3.19 cfs 0.217 af Total Runoff Area = 1.212 ac Runoff Volume = 0.217 af Average Runoff Depth = 2.15" 85.06% Pervious = 1.031 ac 14.94% Impervious = 0.181 ac

File revisions (1)