Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 18

Show all pages
Page 18

Stormwater Management Plan Return Frequency (yr) Inflow (cfs) Revision 0 Discharge (cfs) Stage Elevation (ft) Hydrology and Hydraulics Max Available Storage (cf) Approx. SHWT Elevati on (ft) Bottom of Bioretention Basin Elevation (ft) 1,578 2,187 597.00 598.00 2,175 5,822 593.00 594.00 2,894 4,782 593.70 594.70 1,575 3,203 592.80 593.80 Surface Area (sf) BR-2 WQ 0.37 0.11 598.55 2 (Current) 0.65 0.19 599.40 2 (Future) 0.84 0.23 600.04 10 (Current) 1.14 0.33 601.13 10 (Future) 1.44 0.74 601.23 100 (Current) 2.14 1.85 601.42 100 (Future) 2.83 2.78 601.47 BR-3 WQ 0.31 0.10 594.44 2 (Current) 0.59 0.17 595.19 2 (Future) 0.77 0.20 595.56 10 (Current) 1.05 0.26 596.66 10 (Future) 1.34 0.31 597.57 100 (Current) 1.97 0.34 598.43 100 (Future) 2.63 0.50 599.05 BR-4 WQ 0.50 0.08 595.04 2 (Current) 0.83 0.14 595.53 2 (Future) 1.05 0.16 595.75 10 (Current) 1.44 0.20 596.26 10 (Future) 1.79 0.23 596.69 100 (Current) 2.68 0.32 598.36 100 (Future) 3.49 0.44 598.73 BR-5 WQ 0.33 0.08 594.16 2 (Current) 0.59 0.15 594.69 2 (Future) 0.75 0.17 594.95 10 (Current) 1.04 0.21 595.55 10 (Future) 1.30 0.25 596.23 100 (Current) 1.96 0.32 597.66 100 (Future) 2.55 0.35 598.22 *Basin Information from Exhibit A - Pre-Developed Watershed Map. Public Service Electric & Gas Company 2-4 Burns & McDonnell

File revisions (1)