Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 250

Show all pages
Page 250

Post-Developed (O-AquaShield) NOAA 24-hr D 10-Year_Future Rainfall=6.36", P2=4.07" West Orange HydroCAD_Post Printed 5/13/2024 Page 44 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Pond 4P: AquaShield Inflow Area = Inflow = Primary = 2.221 ac, 24.32% Impervious, Inflow Depth > 4.72" for 10-Year_Future event 7.73 cfs @ 12.21 hrs, Volume= 0.873 af 7.73 cfs @ 12.21 hrs, Volume= 0.873 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Pond 4P: AquaShield Hydrograph Inflow Primary 7.73 cfs Inflow Area=2.221 ac 7.73 cfs 8 7 Flow (cfs) 6 5 4 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24

File revisions (1)