Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 285
Show all pagesPost-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 12 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 8S: PO-DA F Runoff = 0.02 cfs @ 1.15 hrs, Volume= Routed to Reach 4R : TD-02 0.001 af, Depth= 0.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" Area (sf) 1,220 2,526 3,746 3,746 CN 80 73 Description >75% Grass cover, Good, HSG D Brush, Good, HSG D Weighted Average 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.6 66 0.2264 0.19 Sheet Flow, Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.42" Subcatchment 8S: PO-DA F Flow (cfs) Hydrograph Runoff 0.021 0.02 0.019 0.018 0.017 0.016 0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 0.02 cfs NJ DEP 2-hr WQ Rainfall=1.25" P2=3.42" Runoff Area=3,746 sf Runoff Volume=0.001 af Runoff Depth=0.10" Flow Length=66' Slope=0.2264 '/' Tc=5.6 min CN=WQ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes