Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 29
Show all pages1 2 3 5 4 6 7 8 9 10 11 12 13 14 no. LEGEND date by ckd description A 05/07/24 SJM MJB ISSUED FOR REVIEW BASIN DELINEATION TIME OF CONCENTRATION NON-CONTRIBUTORY AREAS A County 20' 40' Road 5 0 80' 77 SCALE IN FEET B C R=544.44 L=154.39 =15°40'20" CH=S21°22'54"W 153.91 Millimeters PO-DA 6 2.93 AC CN=82 D Scale For Microfilming E F G PO-DA 7 2.33 AC CN=81 County Road 57 7 Inches PO-DA 8 0.44 AC CN=94 9400 WARD PARKWAY KANSAS CITY, MO 64114 816-333-9400 date detailed S. MACALUSO COPYRIGHT © 2024 BURNS & McDONNELL ENGINEERING COMPANY, INC. 3/22/24 PO-DA 1 1.21 AC CN=80 H designed S. MACALUSO checked M. BLAKE WEST ORANGE SWITCHING STATION 230/26/4KV OUTDOOR SUBSTATION I PRE-DEVELOPED WATERSHED MAP WEST ORANGE, NJ J State Highway Rt. 10 project contract 144507 drawing rev. EXHIBIT A MICHAEL J. BLAKE LIC NO. 24GE05521600 COA NO. 24GA28066400 sheet file of A sheets
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes