Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 33
Show all pages1 2 3 5 4 6 7 8 9 10 11 12 13 14 no. LEGEND date by ckd description A 05/07/24 SJM MJB ISSUED FOR REVIEW 149.3' BASIN DELINEATION TIME OF CONCENTRATION NON-CONTRIBUTORY AREAS A County 20' 40' Road 5 0 80' 77 SCALE IN FEET B PO-DA A 1.84 AC CN=83 C UD PO-DA B 0.66 AC CN=74 D Millimeters UD Scale For Microfilming UD PO-DA C 0.57 AC CN=87 E H0 H3 H2 H1 PO-DA D 0.15 AC CN=77 Inches UD PO-DA M 0.48 AC CN=95 PO-DA E 0.35 AC CN=88 County Road 57 9400 WARD PARKWAY KANSAS CITY, MO 64114 816-333-9400 PO-DA H 0.24 AC CN=73 PO-DA J 0.32 AC CN=89 311.2' 285.9' UD UD COPYRIGHT © 2024 BURNS & McDONNELL ENGINEERING COMPANY, INC. G 7 UD PO-DA F 0.09 AC CN=75 PO-DA G 0.39 AC CN=88 PO-DA N 1.32 AC CN=81 F date detailed S. MACALUSO 3/22/24 designed S. MACALUSO PO-DA I 0.24 AC CN=88 PO-DA L 0.18 AC CN=74 H checked M. BLAKE WEST ORANGE SWITCHING STATION 230/26/4KV OUTDOOR SUBSTATION UD I POST-DEVELOPED WATERSHED MAP UD WEST ORANGE, NJ State Highway Rt. 10 J PO-DA K 0.10 AC CN=82 project contract 144507 drawing rev. EXHIBIT B MICHAEL J. BLAKE LIC NO. 24GE05521600 COA NO. 24GA28066400 sheet file of A sheets
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes