Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 5

Show all pages
Page 5

Stormwater Management Plan Revision 0 Table of Contents Section Number EXHIBIT A EXHIBIT B APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F INDEX AND CERTIFICATION Public Service Electric and Gas Company Stormwater Management Plan Project No. 144507 Report Index Section Title Site Conditions Hydrology and Hydraulics Best Management Practices Soil Erosion and Sediment Control Measures Conclusions Pre-Developed Watershed Plan Post-Developed Watershed Plan Design Notes HydroCAD Output CivilStorm Output Stormwater Maintenance Plan & Field Manuals Subsurface Investigation Reference Materials Certification [hereby certify, as a Professional Engineer in the state of New Jersey, that the information in this document was assembled under my direct personal charge. This report is not intended or represented to be suitable for reuse by the Public Service Electric and Gas Company or others without specific verification or adaptation by the Engineer. bo SPR he Michael J. Blake, P.E. J. PE: Nos 24GE05521600 O:C-A.No. 24GA28066400 Additional reference information provided by others and not certified by ‘the-above sealing Engineer. Section Number Section Title APPENDIX E APPENDIX F Subsurface Investigation Reference Materials Public Service Electric & Gas Company TOC-1 Burns & McDonnell

File revisions (1)