Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 572
Show all pagesPost-Developed (O-1B) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 15 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 11S: PO-DA I Runoff = 0.33 cfs @ Routed to Pond 5P : BR-05 1.13 hrs, Volume= 0.010 af, Depth= 0.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" Area (sf) 2,904 1,737 5,866 10,507 7,603 2,904 * CN 98 80 85 Description Impervious, Pavement, HSG D >75% Grass cover, Good, HSG D Yard Stone/Gravel Pad, HSG D Weighted Average 72.36% Pervious Area 27.64% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.4 100 0.0237 0.26 Sheet Flow, Gravel Sheet Flow n= 0.100 P2= 3.42" 0.1 20 0.0320 2.88 Shallow Concentrated Flow, Shallow Concentrated Flow Unpaved Kv= 16.1 fps 6.5 120 Total Subcatchment 11S: PO-DA I Hydrograph Runoff 0.36 0.33 cfs 0.34 NJ DEP 2-hr WQ Rainfall=1.25" P2=3.42" Runoff Area=10,507 sf Runoff Volume=0.010 af Runoff Depth=0.48" Flow Length=120' Tc=6.5 min CN=WQ 0.32 0.3 0.28 0.26 Flow (cfs) 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes