J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 751

Show all pages
Page 751

Post-Developed (O-1B) NOAA 24-hr D 10-Year_Future Rainfall=6.36", P2=4.07" West Orange HydroCAD_Post Printed 5/13/2024 Page 194 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Pond 8P: O-1B Inflow Area = Inflow = Primary = 1.863 ac, 27.41% Impervious, Inflow Depth > 4.87" for 10-Year_Future event 1.81 cfs @ 12.45 hrs, Volume= 0.756 af 1.81 cfs @ 12.45 hrs, Volume= 0.756 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Pond 8P: O-1B Hydrograph 2 Inflow Primary 1.81 cfs Inflow Area=1.863 ac Flow (cfs) 1.81 cfs 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24