Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 859

Show all pages
Page 859

Post-Developed (O-2) West Orange HydroCAD_Post NOAA 24-hr D 2-Year_Current Rainfall=3.45", P2=3.45" Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Printed 5/13/2024 Page 12 Time span=0.00-24.00 hrs, dt=0.0100 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 16S: PO-DA N Pond 25P: O-2 Runoff Area=57,457 sf 15.92% Impervious Runoff Depth>1.71" Flow Length=452' Tc=11.6 min CN=WQ Runoff=2.06 cfs 0.188 af Inflow=2.06 cfs 0.188 af Primary=2.06 cfs 0.188 af Total Runoff Area = 1.319 ac Runoff Volume = 0.188 af Average Runoff Depth = 1.71" 84.08% Pervious = 1.109 ac 15.92% Impervious = 0.210 ac

File revisions (1)