Supporting Documentation · Aug 15, 2024
M_ZB 691 Eagle Rock Ave Engineering Forestry 2
db58c1db74e574feb5dae4450f828dfb6fd692a6b8f5e35e70c8403d42232189Indexed text · page 4
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org 4.9. The Applicant’s professional is responsible for ensuring the effectiveness of proposed seepage pit and provide sufficient regular oversight during its construction; 4.10. A Certification stating that the seepage pit was constructed according to the design is to be submitted by the Applicant’s professional; 4.11. The Applicant/Owner will be responsible for ensuring that the seepage pit is regularly and effectively maintained without negative impacts to neighboring properties; 4.12. The following additional information should be provided in the stormwater maintenance manual: Name and phone number of the person(s) responsible for maintenance Map to scale showing the location of the drywells Maintenance for drywells structural components should include at least annual inspection for cracking, subsidence, and erosion Maintenance for components that could clog the drywells should be included Replacement of damaged components Additional maintenance guidance is available at NJDEP New Jersey Department of Environmental Protection: https://www.nj.gov/dep/stormwater/ Not Addressed. Maintenance Manual has not been submitted. 4.13. All details showing paving sections should consistently reference current NJDOT Hot Mix Asphalts. Addressed. Paving detail has been revised to reference current NJDOT HMA. 4.14. Testimony should be provided regarding HVAC, generator and other Mechanical equipment. 4.15. It is assume the Applicant/Owner will own and be responsible for on-site water and sewer improvements. This should be confirmed. V. PERMITS 5.1. Should the Board approve this application: 5.1.1. Certification from the Hudson-Essex-Passaic Soil Conservation District will be required if more than 500 sf of disturbance will occur. 5.1.2. Soil removal permit will be required if more than 300 CY of soil will need to be moved. 5.1.3. A street opening permit for work within the ROW.
File revisions (1)
- Sep 29, 2026
db58c1db74e5777,263 bytes