Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

6 27 2024 Anderson Memo in Response to CME Review Letter

Preserved file SHA-256fc7b6340a4680ded5f0bdd3743ae18172c142e092f7ebf06ce538638e3f867ae

Indexed text · page 2

Show all pages
Page 2

18. 19, 20. 21. 22. 23\, 24, 25: 26. 27. 28. 29. 30. 31. 32. 33. 34, 35. 36. 37. 38. 39. 40. 41. 42. 43, 44, [eesigemeg/ ACS Anderson Consulting Services LLC Various labels for proposed structures around the clubhouse and dog park have been added to the Site Plans. Proposed 2 sided EV charging stations have been added and noted on the site plan. Each building has at least one station that services 2 cars at once. Additional EV spaces will be provided in the parking garages. Callouts for Belgian block curb have been added throughout the site. Only Belgian block curb is proposed, the concrete curb detail has been removed. Dimensions have been added to the plan showing the distance between the face of the curb and the sidewalk. Curb radii have been added to the plan in areas where they were missing. The road stationing is shown on the plan and profile drawings. The project is exempt from bulk and design requirements of the ordinance. North arrows have been added to the Zoning map and Street maps on the Cover sheet SP-1. A copy of the NJDEP approval will be submitted to the planning board. The parking calculations have been updated on the Zoning Schedule on sheet SP-3. The discrepancy about the number of 3-bedroom units has been corrected. The design for the traffic circle at the end of the Proposed ‘Road D’ has been revised to be outside of the 100 ft minimum buffer from the northerly property line. The Overall Site Plan sheet SP-4 has been revised to have a label for the proposed boardwalk. The dimension of the sidewalk on the westerly side of the parking lot between buildings B and C has been corrected. The one-way driveway exiting Building C has been revised to have a concrete driveway apron and a depressed curb. These are noted on the Site Plan A sheet SP-5. More detail in the form of callouts has been added to the Warner Road crossing. One (1) handicap parking space and access aisle have been added to the parking lot servicing the maintenance and kennel buildings. The area detailed in this comment is a dumpster enclosure area and has been labeled as such on the Site Plan B sheet SP-6, Labels for the proposed Kennel and Maintenance buildings have been added on Site Plan B & C sheets SP-6 & SP-7. Labels for the proposed basins 1, 2, & 7 have been added to the Site PlanC &D sheets SP-7 & SP-8. Labels for the proposed structures

Page 2

buildings have been added on Site Plan B & C sheets SP-6 & SP-7. Labels for the proposed basins 1, 2, & 7 have been added to the Site PlanC &D sheets SP-7 & SP-8. Labels for the proposed structures around the clubhouse pool have been added to the Site Plan D sheet SP-8, The concrete pad described is for a dumpster. Labels for this have been added on Site Plan E sheet SP-9. The dimension of a 4ft sidewalk on the southerly side of Road D has been removed as there is no sidewalk proposed there. Labels have been added to the Site Plan on sheet SP-8 & SP-9 to describe the improvements that are proposed around the wetlands crossing. The sidewalk in this area in front of Building D has been revised to be 6ft wide all the way down to the other end of Building D. A sidewalk has been added to the design in the area in front of the 6 parking spaces outside of the Building D 2 garage. See Site Plan E sheet SP-9. This was addressed with comment #42. The sidewalks that will have to account for vehicle overhang have been made 6ft and the opposite side is not a sidewalk. Anderson Consulting Services LLC 40 Miller Drive, Boonton, NJ 07005 973-975-0703 (O) 973-886-7336 (C) PAndersonpe@gmail.com

File revisions (1)