00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches) (inches) 40.80 1.25 0.13 41.60 1.25 0.13 42.40 1.25 0.13 43.20 1.25 0.13 44.00 1.25 0.13 44.80 1.25 0.13 45.60 1.25 0.13 46.40 1.25 0.13 47.20 1.25 0.13 48.00 1.25 0.13 48.80 1.25 0.13 49.60 1.25 0.13 50.40 1.25 0.13 51.20 1.25 0.13 52.00 1.25 0.13 52.80 1.25 0.13 53.60 1.25 0.13 54.40 1.25 0.13 55.20 1.25 0.13 56.00 1.25 0.13 56.80 1.25 0.13 57.60 1.25 0.13 58.40 1.25 0.13 59.20 1.25 0.13 60.00 1.25 0.13 60.80 1.25 0.13 61.60 1.25 0.13 62.40 1.25 0.13 63.20 1.25 0.13 64.00 1.25 0.13 64.80 1.25 0.13 65.60 1.25 0.13 66.40 1.25 0.13 67.20 1.25 0.13 68.00 1.25 0.13 68.80 1.25 0.13 69.60 1.25 0.13 70.40 1.25 0.13 71.20 1.25 0.13 72.00 1.25 0.13 72.80 1.25 0.13 73.60 1.25 0.13 74.40 1.25 0.13 75.20 1.25 0.13 76.00 1.25 0.13 76.80 1.25 0.13 77.60 1.25 0.13 78.40 1.25 0.13 79.20 1.25 0.13 80.00 1.25 0.13 Runoff (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 429

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 277 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 21P: Basin 3 Inflow Area = 51,670 sf, 62.76% Impervious, Inflow Depth = 0.68" for WQ event Inflow = 2.05 cfs @ 1.13 hrs, Volume= 2,914 cf Outflow = 1.21 cfs @ 1.04 hrs, Volume= 2,914 cf, Atten= 41%, Lag= 0.0 min Discarded = 1.21 cfs @ 1.04 hrs, Volume= 2,914 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Pond 27P : Basin 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 559.21' @ 1.24 hrs Surf.Area= 5,227 sf Storage= 449 cf Plug-Flow detention time= 2.7 min calculated for 2,913 cf (100% of inflow) Center-of-Mass det. time= 2.7 min ( 75.8 - 73.1 ) Volume #1 Invert 559.00' Elevation (feet) 559.00 560.00 561.00 561.17 Device #1 #2 Avail.Storage 4,537 cf Surf.Area (sq-ft) 5,227 5,227 5,227 5,227 Routing Primary Discarded Invert 559.22' 559.00' Storage Description Custom Stage Data (Prismatic) Listed below 11,343 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 5,227 5,227 889 Cum.Store (cubic-feet) 0 5,227 10,454 11,343 Outlet Devices 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 10.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=1.21 cfs @ 1.04 hrs HW=559.03' (Free Discharge) 2=Exfiltration (Exfiltration Controls 1.21 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=559.00' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 430

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 278 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 21P: Basin 3 Hydrograph 2.05 cfs Inflow Area=51,670 sf Peak Elev=559.21' Storage=449 cf 2 Inflow Outflow Discarded Primary 1.21 cfs Flow (cfs) 1.21 cfs 1 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 21P: Basin 3 Stage-Discharge Total Discarded Primary Elevation (feet) 561 560 Sharp-Crested Rectangular Weir Exfiltration 559 0 5 10 15 20 Discharge (cfs) 25 30

Page 431

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 279 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 21P: Basin 3 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 559.00 Outflow (cfs) 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Discarded (cfs) 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 432

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 280 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 21P: Basin 3 Elevation (feet) 559.00 559.05 559.10 559.15 559.20 559.25 559.30 559.35 559.40 559.45 559.50 559.55 559.60 559.65 559.70 559.75 559.80 559.85 559.90 559.95 560.00 560.05 560.10 560.15 560.20 560.25 560.30 560.35 560.40 560.45 560.50 560.55 560.60 560.65 560.70 560.75 560.80 560.85 560.90 560.95 561.00 561.05 561.10 561.15 Discharge (cfs) 0.00 1.21 1.21 1.21 1.21 1.28 1.50 1.82 2.20 2.64 3.12 3.65 4.22 4.82 5.46 6.12 6.82 7.54 8.30 9.07 9.87 10.69 11.53 12.40 13.28 14.18 15.10 16.03 16.99 17.96 18.94 19.94 20.95 21.98 23.02 24.07 25.14 26.21 27.30 28.40 29.51 30.63 31.76 32.90 Discarded (cfs) 0.00 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.07 0.29 0.61 0.99 1.43 1.91 2.44 3.01 3.61 4.25 4.91 5.61 6.33 7.09 7.86 8.66 9.48 10.32 11.19 12.07 12.97 13.89 14.82 15.78 16.75 17.73 18.73 19.74 20.77 21.81 22.86 23.93 25.00 26.09 27.19 28.30 29.42 30.55 31.69

Page 433

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 281 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 21P: Basin 3 Elevation (feet) 559.00 559.05 559.10 559.15 559.20 559.25 559.30 559.35 559.40 559.45 559.50 559.55 559.60 559.65 559.70 559.75 559.80 559.85 559.90 559.95 560.00 560.05 560.10 560.15 560.20 560.25 560.30 560.35 560.40 560.45 560.50 560.55 560.60 560.65 560.70 560.75 560.80 560.85 560.90 560.95 561.00 561.05 561.10 561.15 Surface (sq-ft) 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 Storage (cubic-feet) 0 105 209 314 418 523 627 732 836 941 1,045 1,150 1,254 1,359 1,464 1,568 1,673 1,777 1,882 1,986 2,091 2,195 2,300 2,404 2,509 2,614 2,718 2,823 2,927 3,032 3,136 3,241 3,345 3,450 3,554 3,659 3,763 3,868 3,973 4,077 4,182 4,286 4,391 4,495

Page 434

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 282 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 22P: Basin 4 Inflow Area = 57,587 sf, 86.93% Impervious, Inflow Depth = 0.91" for WQ event Inflow = 3.35 cfs @ 1.10 hrs, Volume= 4,362 cf Outflow = 1.13 cfs @ 1.00 hrs, Volume= 4,362 cf, Atten= 66%, Lag= 0.0 min Discarded = 1.13 cfs @ 1.00 hrs, Volume= 4,362 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Pond 27P : Basin 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 572.31' @ 1.26 hrs Surf.Area= 12,197 sf Storage= 1,514 cf Plug-Flow detention time= 11.5 min calculated for 4,360 cf (100% of inflow) Center-of-Mass det. time= 11.5 min ( 81.5 - 70.0 ) Volume #1 Invert 572.00' Elevation (feet) 572.00 573.00 574.00 574.91 Device #1 #2 #3 Avail.Storage 14,197 cf Surf.Area (sq-ft) 12,197 12,197 12,197 12,197 Routing Primary Primary Discarded Invert 574.00' 572.50' 572.00' Storage Description Custom Stage Data (Prismatic) Listed below 35,493 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 12,197 12,197 11,099 Cum.Store (cubic-feet) 0 12,197 24,394 35,493 Outlet Devices 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads 4.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=1.13 cfs @ 1.00 hrs HW=572.05' (Free Discharge) 3=Exfiltration (Exfiltration Controls 1.13 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=572.00' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 2=Orifice ( Controls 0.00 cfs)

Page 435

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 283 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 22P: Basin 4 Hydrograph 3.35 cfs Inflow Area=57,587 sf Peak Elev=572.31' Storage=1,514 cf Flow (cfs) 3 Inflow Outflow Discarded Primary 2 1.13 cfs 1.13 cfs 1 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 22P: Basin 4 Stage-Discharge Total Discarded Primary Sharp-Crested Rectangular Weir Elevation (feet) 574 573 Orifice Exfiltration 572 0 1 2 3 4 5 6 7 8 Discharge (cfs) 9 10 11 12 13

Page 436

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 284 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 22P: Basin 4 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 Outflow (cfs) 0.00 0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Discarded (cfs) 0.00 0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 437

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 285 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 22P: Basin 4 Elevation (feet) 572.00 572.05 572.10 572.15 572.20 572.25 572.30 572.35 572.40 572.45 572.50 572.55 572.60 572.65 572.70 572.75 572.80 572.85 572.90 572.95 573.00 573.05 573.10 573.15 573.20 573.25 573.30 573.35 573.40 573.45 573.50 573.55 573.60 573.65 573.70 573.75 573.80 573.85 573.90 573.95 574.00 574.05 574.10 574.15 574.20 574.25 574.30 574.35 574.40 574.45 574.50 Discharge (cfs) 0.00 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.14 1.16 1.19 1.24 1.30 1.36 1.43 1.49 1.55 1.60 1.65 1.69 1.73 1.76 1.80 1.83 1.86 1.89 1.92 1.95 1.97 2.00 2.03 2.05 2.07 2.10 2.12 2.14 2.17 2.19 2.35 2.64 3.00 3.43 3.90 4.42 4.99 5.59 6.22 6.89 Discarded (cfs) 0.00 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.03 0.07 0.11 0.17 0.23 0.30 0.36 0.43 0.47 0.52 0.56 0.60 0.63 0.67 0.70 0.73 0.76 0.79 0.82 0.85 0.87 0.90 0.92 0.95 0.97 0.99 1.01 1.04 1.06 1.22 1.51 1.87 2.30 2.77 3.29 3.86 4.46 5.09 5.76 Elevation (feet) 574.55 574.60 574.65 574.70 574.75 574.80 574.85 574.90 Discharge (cfs) 7.59 8.31 9.06 9.84 10.64 11.47 12.31 13.18 Discarded (cfs) 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 Primary (cfs) 6.46 7.18 7.93 8.71 9.51 10.34 11.18 12.05