Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text · page 429
Show all pagesPOA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 277 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 21P: Basin 3 Inflow Area = 51,670 sf, 62.76% Impervious, Inflow Depth = 0.68" for WQ event Inflow = 2.05 cfs @ 1.13 hrs, Volume= 2,914 cf Outflow = 1.21 cfs @ 1.04 hrs, Volume= 2,914 cf, Atten= 41%, Lag= 0.0 min Discarded = 1.21 cfs @ 1.04 hrs, Volume= 2,914 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Pond 27P : Basin 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 559.21' @ 1.24 hrs Surf.Area= 5,227 sf Storage= 449 cf Plug-Flow detention time= 2.7 min calculated for 2,913 cf (100% of inflow) Center-of-Mass det. time= 2.7 min ( 75.8 - 73.1 ) Volume #1 Invert 559.00' Elevation (feet) 559.00 560.00 561.00 561.17 Device #1 #2 Avail.Storage 4,537 cf Surf.Area (sq-ft) 5,227 5,227 5,227 5,227 Routing Primary Discarded Invert 559.22' 559.00' Storage Description Custom Stage Data (Prismatic) Listed below 11,343 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 5,227 5,227 889 Cum.Store (cubic-feet) 0 5,227 10,454 11,343 Outlet Devices 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 10.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=1.21 cfs @ 1.04 hrs HW=559.03' (Free Discharge) 2=Exfiltration (Exfiltration Controls 1.21 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=559.00' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes