Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
Preserved file SHA-256
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text · page 15
Show all pagesDocuSign Envelope ID: DB0533B0-B14B-449D-A0A8-3B9C3C0DF5D9 Conclusion The design of the West Essex Highlands Project has been completed in accordance with the court approved resolution with the limiting of the area of disturbance below 30 acres and the inclusion of environmentally friendly designs that are sensitive to the existing environmental constraints. The stormwater design includes green technology for water quantity, quality and seeks to optimize the volume groundwater recharge with green technology. The overall discharge has been conservatively calculated for each drainage basin and overall and meet the discharge standards as required in the state standards and municipal ordinance. 12
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes