Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text · page 257
Show all pagesPOA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 105 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 45S: Basin 11 - Imp Runoff = 6.48 cfs @ 12.17 hrs, Volume= Routed to Pond 33P : Basin 11 27,085 cf, Depth= 4.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NOAA 24-hr D 10-Year Rainfall=5.22" Area (sf) 4,356 7,377 27,007 26,489 65,229 65,229 Tc (min) 8.9 Length (feet) 83 0.9 150 9.8 233 CN 98 98 98 98 98 Description Roofs, HSG D Paved parking, HSG D Roofs, HSG C Paved parking, HSG C Weighted Average 100.00% Impervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0400 0.15 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 0.0330 2.92 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps Total Subcatchment 45S: Basin 11 - Imp Hydrograph Runoff 7 6.48 cfs 6 Flow (cfs) 5 4 3 2 NOAA 24-hr D 10-Year Rainfall=5.22" Runoff Area=65,229 sf Runoff Volume=27,085 cf Runoff Depth=4.98" Flow Length=233' Tc=9.8 min CN=98 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes