Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text · page 395
Show all pagesPOA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 243 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 20S: Basin 3 - Perv Runoff = 0.06 cfs @ 1.24 hrs, Volume= Routed to Pond 21P : Basin 3 118 cf, Depth= 0.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 19,242 19,242 Tc (min) 8.3 Length (feet) 75 CN 74 Description >75% Grass cover, Good, HSG C 100.00% Pervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0400 0.15 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Subcatchment 20S: Basin 3 - Perv Hydrograph 0.065 0.06 0.055 0.05 Flow (cfs) 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 Runoff 0.06 cfs NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=19,242 sf Runoff Volume=118 cf Runoff Depth=0.07" Flow Length=75' Slope=0.0400 '/' Tc=8.3 min CN=74 0.005 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes