Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

Revised Stormwater Management Report

Preserved file SHA-25669ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29

Indexed text · page 47

Show all pages
Page 47

POA 1 proposed 2024-05-12 HydroCad - Proposed POA 1 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 30 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Link 25L: POA 1 Inflow Area = Inflow = Primary = 447,746 sf, 43.41% Impervious, Inflow Depth > 0.57" for 2-Year event 2.46 cfs @ 12.15 hrs, Volume= 21,370 cf 2.46 cfs @ 12.15 hrs, Volume= 21,370 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 25L: POA 1 Hydrograph 2.46 cfs 2.46 cfs Inflow Primary Inflow Area=447,746 sf Flow (cfs) 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

File revisions (1)