Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text · page 560
Show all pages— al: jroundwater = jecharge Select Township | | rowns! oxeesstrert ere TOwnENR, Factor iovember 2003 1.67 Annual Annual Annual Annual Land | Area TR-55 Land Cover soil | Recharge | Recharge Recharge | Recharge Segment | (acres) {in (cust) (in) (cust) 4 0.0 0.0 2 0.0 0.9 3 0.0 = 0.0 4 41467 4,070 0.0 2 5 155 90,995 147 60,987 8 14,9 43,952 | 0.0 : 7 45.7 959,416 14.9 300,916 8 23,872 8 40 1 12 13 14 45 Total = 29.0 Procedure to fill the Pre-Development and Post-Development Conditions Tables and proceed downward. Dont leave ‘displayed or used in calculations. For impervious areas outside of standard lots ‘Soll type for impervious areas are only required if an ifitation facil will be bu rea, then select TR-55 Land Cover, then select Sol, Start from the top of the table ‘ows (with A=) in between your segment entries. Rows with A=O wll al be Impervious Asea (qf) 614,632 a Post-Development Annual Recharge Deficit= 629,658 |(cubic feet) sf ' # 4 i RWC= 2.37 DRWC= 0.00 (in) a ERWC = 0.39 EDRWC= 0.00 in) < ,
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes