Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

Revised Stormwater Management Report

Preserved file SHA-25669ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29

Indexed text · page 560

Show all pages
Page 560

— al: jroundwater = jecharge Select Township | | rowns! oxeesstrert ere TOwnENR, Factor iovember 2003 1.67 Annual Annual Annual Annual Land | Area TR-55 Land Cover soil | Recharge | Recharge Recharge | Recharge Segment | (acres) {in (cust) (in) (cust) 4 0.0 0.0 2 0.0 0.9 3 0.0 = 0.0 4 41467 4,070 0.0 2 5 155 90,995 147 60,987 8 14,9 43,952 | 0.0 : 7 45.7 959,416 14.9 300,916 8 23,872 8 40 1 12 13 14 45 Total = 29.0 Procedure to fill the Pre-Development and Post-Development Conditions Tables and proceed downward. Dont leave ‘displayed or used in calculations. For impervious areas outside of standard lots ‘Soll type for impervious areas are only required if an ifitation facil will be bu rea, then select TR-55 Land Cover, then select Sol, Start from the top of the table ‘ows (with A=) in between your segment entries. Rows with A=O wll al be Impervious Asea (qf) 614,632 a Post-Development Annual Recharge Deficit= 629,658 |(cubic feet) sf ' # 4 i RWC= 2.37 DRWC= 0.00 (in) a ERWC = 0.39 EDRWC= 0.00 in) < ,

File revisions (1)