Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

Traffic Report

Preserved file SHA-2565b8e2b1acb10006811dd51d8d266ce09ebe4eb3368329f2be038a9cf8aaa163c

Indexed text · page 105

Show all pages
Page 105

SITE TRIP DISTRIBUTION The site trips generated on the loop roads of the development are assumed to be evenly split between Warner Road and Kuzik Drive. The site trips generated by the single building on the extension of Bayowski Road will, of course, only have access to Bayowski Road. The following tables show the site trip distribution by access roadway. West Essex Highlands Residential Development Estimated Site Trip Generation – 350 Units Access Roadway Assignments Time Vehicle Trips Access Roadway Period Total Entering Exiting Warner Road 50 13 37 Kuzik Drive 49 13 36 AM Bayowski Road 27 7 20 Totals 126 33 93 Warner Road 61 37 24 Kuzik Drive 60 37 23 PM Bayowski Road 33 20 13 Totals 154 94 60 Warner Road 754 377 377 Typical Kuzik Drive 754 377 377 Day Bayowski Road 418 209 209 Totals 1,926 963 963 11

File revisions (1)