Supporting Documentation · Jul 30, 2024
Traffic Report
Preserved file SHA-256
5b8e2b1acb10006811dd51d8d266ce09ebe4eb3368329f2be038a9cf8aaa163cIndexed text · page 3
Show all pagesList of Figures Figure 1 - Site Location Map Figure 2 - 2024 Existing Traffic Volumes Figure 3 - 2027 No-Build Traffic Volumes Figure 4 - Arrival and Departure Distributions Figure 5 - Total Site-Generated Trips Figure 6 - Rerouted Traffic Volumes Figure 7 - 2027 Build Traffic Volumes List of Tables Table 1 – Future Trip Generation Estimates Table 2 – Trip Generation Comparison Table 3 – Trip Distribution Table 4 – Intersection Capacity Analysis Summary Appendices Appendix A - Figures Appendix B - Traffic Counts Appendix C - Timing Directive Appendix D - Capacity Analysis Worksheets Appendix E - Signal Warrant Analysis Appendix F - Prior TIS prepared by Lublanecki Engineering, Inc.
File revisions (1)
- Sep 29, 2026
5b8e2b1acb109,565,410 bytes