Supporting Documentation · Jul 30, 2024
Traffic Report
5b8e2b1acb10006811dd51d8d266ce09ebe4eb3368329f2be038a9cf8aaa163cIndexed text · page 64
Show all pagesLanes, Volumes, Timings 2027 Build 2: Crestmont Country Club Drwy/Oval Road & Eagle Rock Avenue (CR 611) AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Reduced v/c Ratio 0.14 0.21 0.01 0.37 0.00 0.00 0.28 0.28 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 74 (82%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.37 Intersection Signal Delay (s/veh): 9.6 Intersection LOS: A Intersection Capacity Utilization 70.3% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2: Crestmont Country Club Drwy/Oval Road & Eagle Rock Avenue (CR 611) Scenario 1 2027 Build 11:52 am 05/23/2024 AM Peak Hour Synchro 12 Report Langan Page 6
File revisions (1)
- Sep 29, 2026
5b8e2b1acb109,565,410 bytes