Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

Traffic Report

Preserved file SHA-2565b8e2b1acb10006811dd51d8d266ce09ebe4eb3368329f2be038a9cf8aaa163c

Indexed text · page 71

Show all pages
Page 71

Lanes, Volumes, Timings 2027 Build 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 451 274 281 318 462 408 Future Volume (vph) 451 274 281 318 462 408 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 575 0 0 Storage Lanes 0 1 1 1 Taper Length (ft) 50 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.943 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3391 0 1787 3574 1805 1615 Flt Permitted 0.216 0.950 Satd. Flow (perm) 3391 0 406 3574 1805 1615 Right Turn on Red Yes Yes Satd. Flow (RTOR) 150 426 Link Speed (mph) 40 40 35 Link Distance (ft) 265 830 204 Travel Time (s) 4.5 14.1 4.0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 1% 1% 1% 0% 0% Adj. Flow (vph) 485 295 302 342 497 439 Shared Lane Traffic (%) Lane Group Flow (vph) 780 0 302 342 497 439 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 10 12 12 Link Offset(ft) 0 0 25 Crosswalk Width(ft) 35 15 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning

Page 71

0 25 Crosswalk Width(ft) 35 15 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Number of Detectors 2 1 2 1 1 Detector Template Thru Left Thru Left Right Leading Detector (ft) 100 20 100 20 20 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 6 20 6 20 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 Detector 2 Size(ft) 6 6 Detector 2 Type Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 Turn Type NA pm+pt NA Prot Prot Protected Phases 2 1 6 8 8 Scenario 2 2027 Build 10:26 am 06/20/2024 PM Peak Hour Synchro 12 Report Langan Page 1

File revisions (1)