Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

West Orange WEHI preliminary report

Preserved file SHA-25692be0c4f8dc9f029b4d9855faf8d539197fbda5381caf3510c6b59bf906bb1e5

Indexed text · page 1

Show all pages
Page 1

1 July 1, 2024 Ms. Geneice Gary-Adams, Director/Zoning Official Township in West Orange Planning and Development 66 Main Street West Orange, NJ 07052 Re: Review Report re: Environmental Conditions of Settlement Agreement West Essex Highlands Via Electronic Mail zoningofficial@westorange.org Dear Ms. Gary-Adams, Thank you for the opportunity to assist the Township of West Orange (Client) in the matter of the proposed housing development known as the West Essex Highlands (Applicant). In preparation for the hearings on July 16 and 17, 2024, DeFeo Associates has conducted a review of the submitted plans to confirm compliance with Exhibit C (Design Terms and Conditions) of the West Essex Highlands Settlement Agreement (Agreement). To date, the Applicant has submitted site plan documents that related to the overall site layout. Preliminary architectural drawings have also been provided. However, building details have not yet been submitted regarding the majority of required sustainable building standards, thus, this review will only address those items related to the actual structures that have been submitted to date. The following highlights those plan elements that have been submitted to date and their consistency with the above referenced Settlement Agreement. Where no comment has been made, the Applicant appears to have met the minimum design standard. Where any deviation from the Agreement has been observed, that deviation is highlighted as to the nature of and impact of the deviation. WEI-II shall implement the following design standards in constructing the Proposed Development: 2. Site & Landscaping: a. Implement a Tree Preservation and Replacement Plan in accordance with the following parameters:

File revisions (1)