Supporting Documentation · Aug 15, 2024
24 07 24 Review 1 CME
b403ba86be1a3ebe3ccacaa5f0fe71b028206dcb950ec75cd0dddbb8c92b2e19Indexed text · page 2
Show all pages\ ASSOCIATES Chairman and Members of the West Orange Township Zoning Board July 24, 2024 Re: PSE&G Company (ZB-24-06) Our File No. 115.WRZ0155.V04 Preliminary & Final Site Plan with ‘C’ and ‘D’ Page 2 ° Variances and Tree Removal Permit - Review #1 A set of Boundary and Topographic Survey plans (3 sheets) prepared by Michael D. Ragsdale, PLS dated May 2, 2024. Areport entitled “Requirements for Variances and Reasons for Relief Statement” prepared by Noreen Merainer, PP, PMP with Public Service Electric and Gas Company dated May 10, 2024. A report entitled “Stormwater Management Plan” prepared by Michael J. Blake, PE dated May 9, 2024. A report entitled “Stormwater Management Measures Maintenance Plan and Field Manuals” prepared by Michael J. Blake, PE and dated April 30, 2024. Included in the report are the following documents: o A Supplemental Test Pits and Permeability Testing Report prepared by Christopher McLaughlin, PE with GZA GeoEnvironmental, Inc. of South Bound Brook, New Jersey and dated January 17, 2023 o A Subsurface Investigation Report prepared by Christopher McLaughlin, PE dated August 8, 2022. o A Thermal Analysis of Native Soil Samples prepared by Nimesh Patel with Geotherm USA of Cypress, Texas dated June 16, 2022. o A Stormwater Management Report prepared by Barry J. Sutherland, PW with TRC Engineers, Inc. of Millourn, New Jersey dated March 2012. o A Subsurface Investigation Report prepared by Mark R. Denno, PE and Todd E. Horowitz, PE with Mellick-Tully and Associates, PC of South Bound Brook, New Jersey dated May 17, 2011. o A Custom Soil Resource Report for the PSE&G West Orange Switching Station from the United States Department of Agriculture Natural Resources Conservation Service dated December 8, 2022. A May 15, 2024 letter from Noreen Merainer, PP, PMP to the West Orange Zoning Board of Adjustment which provides details of the project scope, sets forth the requested variances and lists the required outside agency approvals. A completed Application Form dated May 10, 2024. A completed Application for Tree Removal and Replacement Permit dated May 15, 2024. A completed Ownership Disclosure dated May 10, 2024. A completed Affidavit of Ownership dated May 10, 2024. ‘S:\West Orange\Zoning Board\1 15.WRZ0155.V04 - PSE&G Company\24.07-24 Review #1.docx
File revisions (1)
- Sep 29, 2026
b403ba86be1a588,295 bytes