Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

24 07 24 Review 1 CME

Preserved file SHA-256b403ba86be1a3ebe3ccacaa5f0fe71b028206dcb950ec75cd0dddbb8c92b2e19

Indexed text · page 5

Show all pages
Page 5

Men CMe ASSOCIATES Chairman and Members of the West Orange Township Zoning Board July 24, 2024 Re: PSE&G Company (ZB-24-06) Our File No. 115.WRZ0155.V04 Preliminary & Final Site Plan with ‘C’ and ‘D’ Page 5 Variances and Tree Removal Permit - Review #1 ¢) Item #49 — Vehicular and pedestrian circulation patterns. d) Item #50 — Parking plan showing spaces, size and type, aisle width, curb cuts, drives, driveways, and all ingress and egress areas and dimensions. . As stipulated in §25-13 of the Ordinance, an environmental impact statement must be submitted to the Board. It shows on sheet 792788 of the West Orange Switching Station plans that the existing ; sidewalk along the Prospect Avenue and Mt. Pleasant Avenue site frontages is to be removed. However, it shows on sheet 3 of the Site Plan drawings that the existing sidewalk is to be removed/replaced if necessary. This discrepancy must be resolved. Please note that our office is opposed to removal of the existing sidewalk along the site frontages. . Sheet 792796 includes a Standard Concrete Driveway and Concrete Apron detail. Therefore, the plans must be revised to show where a concrete driveway and concrete apron are proposed. . Sheet 792797 includes a Typical Bollard Detail. Therefore, the plans must be revised to show the locations where bollards are proposed. Based on our review, we find that the following utility conflicts exist on the West Orange Switching Station plans: a) Existing electric line and proposed manhole MH-01 b) Existing gas line and proposed manholes MH-03 and MH-04 and storm pipe SD- 05 c) Existing electric line and proposed manhole MH-04 d) Existing gas line and proposed manhole MH-06 e) Existing duct bank and proposed storm pipe SD-10 . Based on our review, it appears that utility conflicts may exist at the following locations: a) Existing electric line and proposed storm pipe SD-04 b) Existing duct bank and proposed storm pipe SD-21 c) Existing duct bank and proposed storm pipe SD-22 d) Existing gas and electric lines and proposed storm pipe SD-10 . It shows on the plans that Basins BR-04 and BR-05 will be located very close to the adjoining drive paths. The Applicant should address the Board regarding the need to install guide rails to prevent vehicles from driving into the basins. ‘S:\West OrangelZoning Board\1 15 WRZ0155.V04 « PSE&G Company\24-07-24 Review

Page 5

cant should address the Board regarding the need to install guide rails to prevent vehicles from driving into the basins. ‘S:\West OrangelZoning Board\1 15 WRZ0155.V04 « PSE&G Company\24-07-24 Review #1.docx

File revisions (1)