48 001 Plan_Permit 20240823 R1 Sealed

Preserved file SHA-25670bd48c443a54f1d16aae3286430f487f8d917e25b04f16e111c8c4336307d2a

Indexed text

Page 10

RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: · · · NOTE: ALL DIMENSIONS ARE NOMINAL INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON INSERTA-TEE SIDE INLET DETAIL *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). B EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE CORED END CAPS END WITH "PC" A AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. A INSERTA TEE CONNECTION BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). OR MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. 16.0" (406 mm) ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE A INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE

Page 10

BBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. 16.0" (406 mm) ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE A INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. C FOUNDATION STONE BENEATH CHAMBERS A 6 DESCRIPTION MATERIAL LOCATION DUAL WALL PERFORATED HDPE UNDERDRAIN TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER THAN OR EQUAL TO 400 LBS/FT/%. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 2 SC-310 TECHNICAL SPECIFICATIONS 1 SC-310 CROSS SECTION DETAIL ISSUED FOR PERMIT APPLICATION COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. PROPOSED 3-STORY APARTMENT BUILDING DESIGNED BY: DRAWN BY: AR AR CHECKED BY: APPROVED BY: AR AR ALIASGAR RANGWALA, P.E. NEW JERSEY INDUSTRIAL CODE REQUIRES 410 MAIN ST, WEST ORANGE, NJ DRILL, OR BLAST - STOP CALL DWG: CIVIL & STRUCTURAL ENGINEERS C10 STORMWATER MANAGEMENT DETAILS SHEET: 10 1 REV. SUBMISSION PER COUNTY COMMENTS DATED 4/18/24 5/16/2024 AR OF 17 NO. DESCRIPTION DATE BY DATE: 7/2/2024 SCALE: NOT TO SCALE 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 N.J. PROFESSIONAL ENGINEER LIC. NO. 53255

Page 11

N N 0 10 SITE 20 FEET LOT 265 LOT 304 SCALE 1"-10' .94' S21°20 '00"W 20 © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS 104.98' USGS LOCATION MAP WEST ORANGE TOWNSHIP, ESSEX COUNTY, NJ SCALE: 1" = 200' PARK DRIVE NORTH EXISTING TREE TO BE REMOVED, TYP. LOT 263 LOT 264 LOT 307 LOT 308 84.46' 97.52' LOT 262 S16°20'00"W CONCRETE WASHOUT CONTAINER N77°11'00"W EXISTING TREE TO BE REMOVED, TYP. S68°40 '00"E TREE PROTECTION FENCE (REFER TO DETAIL 4/SHEET 9) INLET PROTECTION (REFER TO DETAIL 3/SHEET 9) LEGEND 139.95' N11°49'00"E LIMITS OF DISTURBANCE MAIN STREET SILT FENCE (REFER TO DETAIL 2/SHEET 9) LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE TOPSOIL STOCKPILE (REFER TO DETAIL 1/SHEET 9) 1 EROSION & SEDIMENT CONTROL PLAN SILT FENCE (REFER TO DETAIL 2/SHEET 9) 1" = 10' TREE PROTECTION FENCE (REFER TO DETAIL 4/SHEET 9) CONCRETE WASHOUT CONTAINER RUNOFF FLOW DIRECTION TREE TO BE REMOVED INLET PROTECTION (REFER TO DETAIL 3/SHEET 9) ISSUED FOR PERMIT APPLICATION COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. PROPOSED 3-STORY APARTMENT BUILDING DESIGNED BY: DRAWN BY: AR AR CHECKED BY: APPROVED BY: AR AR ALIASGAR RANGWALA, P.E. NEW JERSEY INDUSTRIAL CODE REQUIRES 410 MAIN ST, WEST ORANGE, NJ DRILL, OR BLAST - STOP CALL DWG: CIVIL & STRUCTURAL ENGINEERS C11 EROSION & SEDIMENT CONTROL PLAN SHEET: 11 1 REV. SUBMISSION PER COUNTY COMMENTS DATED 4/18/24 5/16/2024 AR OF 17 NO. DESCRIPTION DATE BY DATE: 7/2/2024 SCALE: 1" = 10' 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 N.J. PROFESSIONAL ENGINEER LIC. NO. 53255

Page 12

5. ALL STORM DRAINAGE INLETS SHALL BE PROTECTED BY ONE OF THE PRACTICES ACCEPTED IN THE STANDARDS, AND PROTECTION SHALL REMAIN UNTIL PERMANENT STABILIZATION HAS BEEN ESTABLISHED. STORM DRAINAGE OUTLET POINTS SHALL BE PROTECTED AS REQUIRED BEFORE THEY BECOME FUNCTIONAL. 6. 7. 8. 9. 10. 11. ALL EROSION CONTROL DEVICES SHALL BE PERIODICALLY INSPECTED, MAINTAINED AND CORRECTED BY THE CONTRACTOR. ANY DAMAGE INCURRED BY EROSION SHALL BE RECTIFIED IMMEDIATELY. A. THE APPLICANT MUST OBTAIN A DISTRICT ISSUED REPORT-OF-COMPLIANCE PRIOR TO APPLYING FOR THE CERTIFICATE OF OCCUPANCY OR TEMPORARY CERTIFICATE OF OCCUPANCY FROM THE RESPECTIVE MUNICIPALITY, NJ - DCA OR ANY OTHER CONTROLLING AGENCY. CONTACT THE DISTRICT AT 862-333-4505 TO REQUEST A FINAL INSPECTION, GIVING ADVANCED NOTICE UPON COMPLETION OF THE RESTABILIZATION MEASURES. A PERFORMANCE DEPOSIT MAY BE POSTED WITH THE DISTRICT WHEN WINTER WEATHER OR SNOW COVER PROHIBITS THE PROPER APPLICATION OF SEED, MULCH, FERTILIZER OR HYDRO-SEED. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. DO NOT UTILIZE A FIRE OR GARDEN HOSE TO CLEAN ROADS UNLESS THE RUNOFF IS DIRECTED TO A PROPERLY DESIGNED AND FUNCTIONING SEDIMENT BASIN. WATER PUMPED OUT OF THE EXCAVATED AREAS CONTAINS SEDIMENTS THAT MUST BE REMOVED PRIOR TO DISCHARGING TO RECEIVING BODIES OF WATER USING REMOVABLE PUMPING STATIONS, SUMP PITS, PORTABLE SEDIMENTATION TANKS AND/OR SILT CONTROL BAGS. ALL SURFACES HAVING LAWN OR LANDSCAPING AS FINAL COVER ARE TO BE PROVIDED TOPSOIL PRIOR TO RE-SEEDING, SODDING OR PLANTING. A DEPTH OF 5.0 INCHES, FIRMED IN PLACE, IS REQUIRED, AS PER THE STANDARDS FOR TOPSOILING AND LAND GRADING, EFFECTIVE DECEMBER 2017. 13. A CRUSHED STONE WHEEL CLEANING TRACKING-PAD IS TO BE INSTALLED AT ALL SITE EXITS USING 2 ½ -1” CRUSHED ANGULAR STONE (ASTM 2 OR 3) TO A MINIMUM LENGTH OF 50 FEET AND MINIMUM DEPTH OF 6”. ALL DRIVEWAYS MUST BE PROVIDED WITH CRUSHED STONE UNTIL PAVING IS COMPLETE. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TEST RECOMMENDATIONS SUCH AS THOSE OFFERED BY RUTGERS UNIVERSITY SOIL TESTING LABORATORY. SOIL SAMPLE MAILERS ARE AVAILABLE FROM THE LOCAL COOPERATIVE EXTENSION SERVICE OFFICE. IF SOIL TESTING IS NOT FEASIBLE ON SMALL OR VARIABLE SITE OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE OR 11 POUNDS PER 1,000 SQUARE FEET OF 10-20-10 OR EQUIVALENT WITH 50% WATER

Page 12

FEASIBLE ON SMALL OR VARIABLE SITE OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE OR 11 POUNDS PER 1,000 SQUARE FEET OF 10-20-10 OR EQUIVALENT WITH 50% WATER INSOLUBLE NITROGEN UNLESS A SOIL TEST INDICATES OTHERWISE. APPLY LIMESTONE AS FOLLOWS: TONS/ACRE 3 2 1 LBS./1,000 SQ. FT. 135 90 45 PULVERIZED DOLOMITIC LIMESTONE IS PREFERRED FOR MOST SOILS SOUTH OF THE NEW BRUNSWICK-TRENTON LINE. B. C. D. WORK LIME AND FERTILIZER INTO SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF 4 INCHES WITH A DISC, SPRINGTOOTH HARROW OR OTHER SUITABLE EQUIPMENT. THE FINAL HARROWING OR DISCING OPERATION SHOULD BE ON THE GENERAL CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLE UNIFORM, FINE SEEDBED IS PREPARED. ALL BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE ROLLED TO FIRM THE SEEDBED WHEREVER FEASIBLE. REMOVE FROM THE SURFACE ALL STONES 2 INCHES OR LARGER IN ANY DIMENSION. REMOVE ALL OTHER DEBRIS, SUCH AS WIRE, CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS OR OTHER UNSUITABLE MATERIAL INSPECT SEEDBED JUST BEFORE SEEDING. IF TRAFFIC HAS LEFT THE SOIL COMPACTED, THE AREA MUST BE RETILLED AND FIRMED AS ABOVE. ACID SOIL CONDITIONS SOILS HAVING A PH OF 4 OR LESS OR CONTAINING IRON SULFIDE SHALL BE COVERED WITH A MINIMUM OF 12 INCHES OF SOIL HAVING A PH OF 5 OR MORE BEFORE SEEDBED PREPARATION. THE ADDED SOIL SHALL BE LIMED AS ABOVE. III. SEEDING A. SEE AGRONOMIC RECOMMENDATIONS OR USE MIXTURE RECOMMENDED BY THE COOPERATIVE EXTENSION SERVICE OR SOIL CONSERVATION SERVICE WHICH IS APPROVED BY THE SOIL CONSERVATION DISTRICT. B. STEEP SLOPES INCURRING DISTURBANCE MAY REQUIRE ADDITIONAL STABILIZATION MEASURES. THESE “SPECIAL” MEASURES SHALL BE DESIGNED BY THE APPLICANT’S ENGINEER AND BE APPROVED BY THE SOIL CONSERVATION DISTRICT. THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED, IN WRITING, FOR THE SALE OF ANY PORTION OF THE PROJECT OR FOR THE SALE OF INDIVIDUAL LOTS. NEW OWNERS’ INFORMATION SHALL BE PROVIDED. ADDITIONAL MEASURES DEEMED NECESSARY BY DISTRICT OFFICIALS SHALL BE IMPLEMENTED AS CONDITIONS WARRANT. SEEDBED PREPARATION: SOIL TEXTURE CLAY, CLAY LOAM AND HIGH ORGANIC SOIL SANDY LOAM, LOAM, SILT LOAM LOAMY SAND, SAND THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED IN WRITING AT LEAST 48 HOURS PRIOR TO ANY SOIL DISTURBING ACTIVITIES. FAX - (862) 333-4507 OR EMAIL –

Page 12

, SILT LOAM LOAMY SAND, SAND THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED IN WRITING AT LEAST 48 HOURS PRIOR TO ANY SOIL DISTURBING ACTIVITIES. FAX - (862) 333-4507 OR EMAIL – INFORMATION@HEPSCD.ORG ALL PLAN REVISIONS MUST BE SUBMITTED TO THE DISTRICT FOR PROPER REVIEW AND APPROVAL. 15. II. MULCH MATERIALS SHALL BE UN-ROTTED SMALL GRAIN STRAW APPLIED AT THE RATE OF 70 TO 90 POUNDS PER 1,000 SQUARE FEET AND ANCHORED WITH A MULCH ANCHORING TOOL, LIQUID MULCH BINDERS, OR NETTING TIE DOWN. OTHER SUITABLE MATERIALS MAY BE USED IF APPROVED BY THE SOIL CONSERVATION DISTRICT. 12. 14. B. C. IV. IF SOIL MOISTURE IS DEFICIENT AND MULCH IS NOT USED, SUPPLY NEW SEEDINGS WITH ADEQUATE WATER (A MINIMUM OF 1/4 INCH TWICE A DAY UNTIL VEGETATION IS WELL ESTABLISHED). THIS IS ESPECIALLY TRUE WHEN SEEDINGS ARE MADE IN ABNORMALLY DRY OR HOT WEATHER OR ON DROUGHTY SITES. TOPDRESSING* A. SPRING SEEDINGS WILL REQUIRE AN APPLICATION OF FERTILIZER SUCH AS 10-10-10 OR EQUIVALENT AT 400 POUNDS PER ACRE OR 10 POUNDS PER 1,000 SQUARE FEET BETWEEN SEPTEMBER 1 AND OCTOBER 15. B. FALL SEEDINGS WILL REQUIRE THE ABOVE BETWEEN MARCH 15 AND MAY 1. C. MIXTURES DOMINATED BY WEEPING LOVEGRASS OR LEGUMES MAY NOT NEED TOPDRESSING. D. BERMUDAGRASS SHOULD BE TOPDRESSED BEFORE AUGUST 15. 1) INSTALL ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON PLANS. 2) INSTALL TIRE WASHING SYSTEM AS SHOWN ON PLANS. STRIP, STOCKPILE AND STABILIZE TOPSOIL AT LOCATIONS AS SHOWN ON PLANS. 4) ROUGH GRADE SITE. 5) CONSTRUCT ALL ONSITE UTILITIES. SOIL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED SILT FENCE NOTES CONSTRUCT STRUCTURE(S). SOIL EROSION SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AS 1. PLACE STOCKPILES AT LOCATIONS AS SHOWN ON THE SOIL EROSION AND SEDIMENT CONTROL PLAN. 2. ALL SIDE SLOPES SHALL BE 3 TO 1 OR FLATTER. 3. STOCKPILE SHALL RECEIVE A VEGETATIVE COVER IN ACCORDANCE WITH MINIMUM STABILIZATION REQUIREMENTS. 4. SILT FENCE SHALL BE INSTALLED AS DETAILED HEREON. CONSTRUCTION PROGRESSES. FINE GRADE AND STABILIZE ALL DISTURBED AREAS IN ACCORDANCE WITH THE MINIMUM STABILIZATION REQUIREMENTS. 8) CLEAN AND REGRADE. 9) STABILIZE ANY REMAINING DISTURBED AREAS. 10) REMOVE ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES. 11) INSTALL F.A.B.C. TOP COURSE PAVING AND/OR STONE SURFACE COURSE FOR DRIVEWAY. © 2023 Microsoft

Page 12

TABILIZE ANY REMAINING DISTURBED AREAS. 10) REMOVE ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES. 11) INSTALL F.A.B.C. TOP COURSE PAVING AND/OR STONE SURFACE COURSE FOR DRIVEWAY. © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS USGS LOCATION MAP WEST ORANGE TOWNSHIP, ESSEX COUNTY, NJ SCALE: 1" = 200' TOPSOIL STOCKPILE NTS 1 INLET GRADE DRAWSTRING RUNNING THROUGH FABRIC ALONG TOP OF FENCE FENCE POST - 8 FT ON CENTERS FABRIC SECURED TO POST WITH METAL FASTENERS AND REINFORCEMENT BETWEEN FASTENER AND FABRIC CURB OPENING INSERT 1" REBAR FOR REMOVAL OF BAG FROM INLET LUMBER SILT ACCUMULATION DUMP STRAPS (2 EACH) EXPANSION RESTRAINT (41" NYLON ROPE, 2" FLAT WASHERS) LUNBER DUMP STRAP (TYP.) DIG 6 IN. DEEP TRENCH, BURY BOTTOM FLAP, TAMP IN PLACE 6 IN. PROVIDE FOR FLOOD OVERFLOW A. B. - C. 1 EXIST. GRADE AS CONSTRUCTION PROGRESSES. 7) 3 1 3) 30' 5% MAX. 5' MIN. 3 MULCHING AGRONOMIC RECOMMENDATIONS EARLY SPRING/LATE SUMMER TO EARLY FALL 100 % PERENNIAL RYEGRASS RATE = 100 LBS/ACRE LATE FALL 100 % CEREAL RYE RATE = 112 LBS/ACRE MID-SUMMER 40 % PEARL MILLET 40 % MILLET (GERMAN OR HUNGARIAN) 20 % WEEPING LOVEGRASS RATE = 100 LBS/ACRE PERMANENT SEEDING: (TO BE APPLIED DURING PERIODS OF 3/01 - 11/15, TEMPORARY SEEDING TO BE APPLIED ALL OTHER TIMES OF THE YEAR) LIME: 2 TONS PER ACRE GROUND AREA FERTILIZER: 500 LBS. PER ACRE 10-20-10 SEED: LAWNS - QUALITY SUN AND SHADE 45 % PERENNIAL RYEGRASS* 20 % CHEWING FESCUE 20 % CREEPING RED FESCUE 15 % KENTUCKY BLUEGRASS (* INCLUDE AT LEAST TWO DIFFERENT VARIETIES IN MIX) RATE = 200 LBS/ACRE 30' 5% MAX. SEQUENCE OF CONSTRUCTION 6) MAX. SLOPE = 5% MAX. SLOPE = 5% *IF SLOW RELEASE NITROGEN (300 POUNDS 38-0-0 PER ACRE OR EQUIVALENT) IS USED IN ADDITION TO SUGGESTED FERTILIZER, THIS FOLLOW-UP OF TOPDRESSING IS NOT MANDATORY). MULCHING IS REQUIRED ON ALL SEEDING. MULCH WILL INSURE AGAINST EROSION BEFORE GRASS IS ESTABLISHED AND WILL PROMOTE FASTER AND EARLIER ESTABLISHMENT. (THE EXISTENCE OF SATISFACTORY PERMANENT VEGETATION AT THE TIME OF PROJECT OR UNIT COMPLETION SHALL BE DEEMED AS COMPLIANCE WITH THIS MULCHING REQUIREMENT). SEED, FERTILIZE, LIME AND TOPSOIL (IF REQUIRED) ALL SCALPED AREAS IMMEDIATELY AFTER FINISHED GRADING IS COMPLETED. LIME AND FERTILIZE RECOMMENDATIONS ARE AS FOLLOWS OR ACCORDING TO RESULTS OF SOIL TESTS: A. FERTILIZER TO BE APPLIED AT THE

Page 12

REQUIRED) ALL SCALPED AREAS IMMEDIATELY AFTER FINISHED GRADING IS COMPLETED. LIME AND FERTILIZE RECOMMENDATIONS ARE AS FOLLOWS OR ACCORDING TO RESULTS OF SOIL TESTS: A. FERTILIZER TO BE APPLIED AT THE RATE OF 500 LBS. PER ACRE, 10-20-10. B. TEMPORARY SEEDING: LIME: 2 TONS PER ACRE GROUND AREA FERTILIZER: 500 LBS. PER ACRE 10-20-10 SEED: USE THE FOLLOWING SEED MIXTURE(S) AND RATES BASED ON TIME OF YEAR: SITE VI. APPLY SEED UNIFORMLY BY HAND, CYCLONE (CENTRIFUGAL) SEEDER, DROP SEEDER, DRILL, CULTIPACKER SEEDER OR HYDROSEEDER. THE LATTER MAY BE JUSTIFIABLE FOR LARGE, STEEP AREAS WHERE CONVENTIONAL VEHICLES CANNOT TRAVEL. MULCH SHALL NOT BE INCLUDED IN THE TANK WITH THE SEED. EXCEPT FOR DRILLED, HYDROSEEDED OR CULTIPACKED SEEDINGS, SEED SHALL BE INCORPORATED INTO THE SOIL, TO A DEPTH OF 1/4 TO 1/2 INCH, BY RAKING OR DRAGGING. DEPTH OF SEED PLACEMENT MAY BE 1/2 INCH DEEPER ON COARSE TEXTURED SOIL. AFTER SEEDING, FIRMING THE SOIL WITH A CORRUGATED ROLLER WILL ASSURE GOOD SEED-TO-SOIL CONTACT, RESTORE CAPILLARITY AND IMPROVE SEEDLING EMERGENCE. THIS IS THE PREFERRED METHOD. WHEN PERFORMED ON THE CONTOUR, SHEET EROSION WILL BE MINIMIZED AND WATER CONSERVATION ON SITE WILL BE MAXIMIZED. SILT FENCE 2.0 FT MIN. SEDIMENT FENCES ARE TO BE PROPERLY TRENCHED AND MAINTAINED UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF CONVENTIONAL EQUIPMENT FOR SEEDBED PREPARATION, SEEDING, MULCH APPLICATION AND ANCHORING AND MAINTENANCE. ALL GRADING SHOULD BE DONE IN ACCORDANCE WITH STANDARDS FOR LAND GRADING. INSTALL NEEDED EROSION CONTROL PRACTICES AND FACILITIES SUCH AS DIVERSIONS, GRADE STABILIZATION STRUCTURES, CHANNEL STABILIZATION MEASURES, SEDIMENT BASINS AND WATERWAYS. 2.0 FT MIN. 4. A. 6 IN. SEEDING DATES: THE FOLLOWING SEEDING DATES ARE RECOMMENDED TO BEST ESTABLISH PERMANENT VEGETATIVE COVER WITHIN MOST LOCATIONS IN THE HEPSCD: SPRING - 3/1-5/15 AND FALL – 8/15 – 10/1 SITE PREPARATION: 103 3. SOIL TO BE EXPOSED OR STOCKPILED FOR A PERIOD OF GREATER THAN 14 DAYS, AND NOT UNDER ACTIVE CONSTRUCTION, MAY BE REQUIRED TO BE TEMPORARILY MULCHED, AND SEEDED OR OTHERWISE PROVIDED WITH VEGETATIVE COVER AS PER APPENDIX A3. THIS TEMPORARY COVER SHALL BE MAINTAINED UNTIL SUCH TIME WHEREBY PERMANENT RESTABILIZATION IS ESTABLISHED. V. IRRIGATION (WHERE FEASIBLE) I. 102 2. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES

Page 12

THIS TEMPORARY COVER SHALL BE MAINTAINED UNTIL SUCH TIME WHEREBY PERMANENT RESTABILIZATION IS ESTABLISHED. V. IRRIGATION (WHERE FEASIBLE) I. 102 2. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ON THIS PLAN WILL BE CONSTRUCTED IN ACCORDANCE WITH THE “NEW JERSEY STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL” 7TH EDITION LAST REVISED JULY 2017, EFFECTIVE DECEMBER 2017. THESE MEASURES WILL BE INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCE OR IN THEIR PROPER SEQUENCE AND MAINTAINED UNTIL PERMANENT PROTECTION IS ESTABLISHED. 101 1. N MINIMUM STABILIZATION REQUIREMENTS 100 GENERAL NOTES FOR SOIL EROSION AND SEDIMENT CONTROL PLANS C. DEPTH = D MULCH MATERIALS SHOULD BE UNROTTED SMALL GRAINS OF STRAW, HAY FREE OF SEEDS OR SALT HAY TO BE APPLIED AT THE RATE OF 1-1/2 TO 2 TONS PER ACRE (70 TO 90 POUNDS PER 1,000 SQUARE FEET), EXCEPT THAT WHERE A CRIMPER IS USED INSTEAD OF A LIQUID MULCH-BINDER (TACKIFYING OR ADHESIVE AGENT), THE RATE OF APPLICATION MUST BE DOUBLE THE LOWER RATE. MULCH CHOPPER-BLOWERS MUST NOT GRIND THE MATERIAL. NOTES BAG DETAIL SPREAD UNIFORMLY BY HAND OR MECHANICALLY SO THAT APPROXIMATELY 75 PERCENT TO 95 PERCENT OF THE SOIL SURFACE WILL BE COVERED. FOR UNIFORM DISTRIBUTION OF HAND-SPREAD MULCH, DIVIDE AREA INTO APPROXIMATELY 1,000 SQUARE FEET SECTIONS AND DISTRIBUTE 70 TO 90 POUNDS WITHIN EACH SECTION. MULCH ANCHORING SHOULD BE ACCOMPLISHED IMMEDIATELY AFTER PLACEMENT TO MINIMIZE LOSS BY WIND OR WATER. THIS MAY BE DONE BY ONE OF THE FOLLOWING METHODS, DEPENDING UPON THE SIZE OF THE AREA, STEEPNESS OF SLOPES AND COSTS. DUMP STRAPS WIDTH = W LENGTH = L 1. PLACE SILT FENCE AT LOCATIONS AS SHOWN ON THE SOIL EROSION AND SEDIMENT CONTROL PLAN. 2. THE SLOPE OF THE LAND FOR AT LEAST 30 FEET ADJACENT TO ANY SILT FENCE SHALL NOT EXCEED 5%. 3. SILT FENCE SHALL BE INSTALLED SO WATER CANNOT BYPASS THE FENCE AROUND IT'S ENDS. 4. INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE AS PROMPTLY AS POSSIBLE. EXPANSION RESTRAINT (41" NYLON ROPE, 2" FLAT WASHERS) INSERT 1" REBAR FOR REMOVAL OF BAG FROM INLET SILT FENCE CONSTRUCTION AND INSTALLATION DETAIL NTS 2 INLET FILTER BAG 1. PEG AND TWINE - DRIVE 8 TO 10 INCH WOODEN PEGS TO WITHIN 2 TO 3 INCHES OF THE SOIL SURFACE EVERY 4 FEET IN ALL DIRECTIONS. STAKES MAY BE DRIVEN BEFORE OR AFTER APPLYING MULCH. SECURE MULCH TO SOIL SURFACE BY STRETCHING TWINE BETWEEN PEGS

Page 12

ODEN PEGS TO WITHIN 2 TO 3 INCHES OF THE SOIL SURFACE EVERY 4 FEET IN ALL DIRECTIONS. STAKES MAY BE DRIVEN BEFORE OR AFTER APPLYING MULCH. SECURE MULCH TO SOIL SURFACE BY STRETCHING TWINE BETWEEN PEGS IN A CRISS-CROSS AND A SQUARE PATTERN. SECURE TWINE AROUND EACH PEG WITH TWO OR MORE ROUND TURNS. 2. MULCH NETTINGS - STAPLE PAPER, JUTE, COTTON OR PLASTIC NETTINGS TO THE SOIL SURFACE. USE A DEGRADABLE NETTING IN AREAS TO BE MOWED. 3. CRIMPER (MULCH ANCHORING TOOL) - A TRACTOR-DRAWN IMPLEMENT, SOMEWHAT LIKE A DISC-HARROW, ESPECIALLY DESIGNED TO PUSH OR CUT SOME OF THE BROADCAST LONG FIBER MULCH 3 TO 4 INCHES INTO THE SOIL SO AS TO ANCHOR IT AND LEAVE PART STANDING UPRIGHT. THIS TECHNIQUE IS LIMITED TO AREAS TRAVERSABLE BY A TRACTOR, WHICH MUST OPERATE ON THE CONTOUR OF SLOPES. STRAW MULCH RATE MUST BE 3 TONS PER ACRE. NO TACKIFYING OR ADHESIVE AGENT IS REQUIRED. 4. LIQUID MULCH-BINDERS - MAYBE USED TO ANCHOR SALT HAY, HAY OR STRAW MULCHES. INSTALLATION DETAIL INLET FILTERS TREE PROTECTION FENCE 3 INLET PROTECTION DETAIL NTS a. APPLICATIONS SHOULD BE HEAVIER AT EDGES WHERE WIND CATCHES THE MULCH, IN VALLEYS AND AT CRESTS OF BANKS. REMAINDER OF AREA SHOULD BE UNIFORM IN APPEARANCE. b. USE OF THE FOLLOWING: b.a. EMULSIFIED ASPHALT - (SS-1, CSS-1, CMS-2, MS-2, RS-1, RS-2, CRS-1 AND CRS-2). APPLY 0.04 GAL./SQ.YD. OR 194 GAL./ACRE ON FLAT SLOPES LESS THAN 8 FEET OR MORE HIGH, USE 0.075 GAL./SQ.YD. OR 363 GAL./ACRE. b.b. CUTBACK ASPHALT - RAPID CURING (RC-70, RC-250 AND RC-800) OR MEDIUM CURING (MC-250 OR MC-800). APPLY 0.04 GAL./SQ.YD. OR 194 GAL./ACRE ON FLAT AREAS AND ON SLOPES LESS THAN 8 FEET HIGH. ON SLOPES 8 FEET OR MORE HIGH, USE 0.075 GAL./SQ.YD. OR 363 GAL./ACRE. b.c. SYNTHETIC OR ORGANIC BINDERS - BINDERS SUCH AS CURASOL, DCA-70, PETRO-SET AND TERRA-TACK MAY BE USED AT RATES RECOMMENDED BY THE MANUFACTURER TO ANCHOR MULCH MATERIALS. NOTE PLACE FENCE A MINIMUM OF 1'-0" OUTSIDE DRIP LINE OF EXISTING TREE. NOTE:ALL NAMES GIVEN ABOVE ARE REGISTERED TRADE NAMES. THIS DOES NOT CONSTITUTE A RECOMMENDATION OF THESE PRODUCTS TO THE EXCLUSION OF OTHER PRODUCTS. D. WOOD-FIBER OR PAPER-FIBER MULCH AT THE RATE OF 1,500 POUNDS PER ACRE MAY BE APPLIED BY A HYDROSEEDER. USE IS LIMITED TO FLATTER SLOPES AND DURING OPTIMUM SEEDING PERIODS IN SPRING AND FALL. 4 TREE PROTECTION DETAIL NTS ISSUED FOR PERMIT APPLICATION COPYRIGHT 2022 ALL RIGHTS RESERVED. THE