Supporting Documentation · Sep 4, 2024
CME Associates Review 3
fff3719caf56bd963c4cbfc2013d2d12e09413901131a144df5c47645a2461a8Indexed text · page 5
Show all pages—— — che Consulting & Municipal ASSOCIATES ENGINEERS Chairman and Members of the West Orange Township Planning Board August 28, 2024 Re: 410 Main St. Holdings, LLC (PB 24-06) Our File No. VWRP0113.01 Preliminary & Final Site Plan with “C” Variances - Review #3 Page 5 the rim and invert elevation of the sanitary sewer manhole and the proposed invert elevations of the sanitary sewer lateral must be shown. 21. It remains for the following details to be added to the plans: a) Retaining wall b) Belgian block curb c) Electric Vehicle charging station & sign d) Sewer lateral 22. It remains for the Applicant to submit calculations of the anticipated sanitary sewer flows to the Planning Board and the Municipal Engineer for a determination that the existing system has adequate capacity to accommodate the anticipated flows from the proposed development. 23. As a condition of any approval granted by the Board, it is our recommendation that the Applicant be required to consolidate the three (3) existing lots. Prior to recording, a copy of the proposed Deed of Consolidation must be submitted to the Board for review and approval by the Board Attorney and our office. In addition, the proposed lot number for the consolidated parce! must be approved in writing by the West Orange Tax Assessor. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent. 'S:\West Orange\Planning Board\VWRPO113 01 - 410 Main St Holdings, LLC\24-08.28 Review #3 dock
File revisions (1)
- Sep 29, 2026
fff3719caf56342,651 bytes