Supporting Documentation · Sep 12, 2024
24 09 09 CME Review 2
f9f2c3e72f779e6e0fbfa9205faa2cbe8b7c367fc93102bb20ae59e6f775ace9Indexed text · page 2
Show all pages———SS = &@& _ Consulting & Municipal ENGINEERS Chairman and Members of the West Orange Township Zoning Board September 9, 2024 Re: PSE&G Company (ZB-24-06) Our File No. 115.WRZ0155.V04 Preliminary & Final Site Plan with ‘C’ and ‘D’ Page 2 Variances and Tree Removal Permit - Review #2 e An Environmental Impact Memorandum dated August 29, 2024. In addition to the above, our office previously received the following information as part of the original submission for this application: e A set of Site Plan drawings (3 sheets) prepared by Michael J. Blake, PE with Burns McDonnell of Kansas City, Missouri and Michael D. Ragsdale, PLS with PSEG Services Corporation of Newark, New Jersey dated May 2, 2024. e Asset of unsigned West Orange Switching Station plans (16 sheets) prepared by Jonathan M. Copa, PE and Michael J. Blake, PE with Burns McDonnell dated March 20, 2023. e A set of Boundary and Topographic Survey plans (3 sheets) prepared by Michael D. Ragsdale, PLS dated May 2, 2024. e Areport entitled “Requirements for Variances and Reasons for Relief Statement” prepared by Noreen Merainer, PP, PMP with Public Service Electric and Gas Company dated May 10, 2024. e Areport entitled “Stormwater Management Plan” prepared by Michael J. Blake, PE dated May 9, 2024. e A report entitled “Stormwater Management Measures Maintenance Plan and Field Manuals” prepared by Michael J. Blake, PE and dated April 30, 2024. Included in the report are the following documents: o A Supplemental Test Pits and Permeability Testing Report prepared by Christopher McLaughlin, PE with GZA GeoEnvironmental, Inc. of South Bound Brook, New Jersey and dated January 17, 2023 o A Subsurface Investigation Report prepared by Christopher McLaughlin, PE dated August 8, 2022. o A Thermal Analysis of Native Soil Samples prepared by Nimesh Patel with Geotherm USA of Cypress, Texas dated June 16, 2022. o A Stormwater Management Report prepared by Barry J. Sutherland, PW with TRC Engineers, Inc. of Millburn, New Jersey dated March 2012. o A Subsurface Investigation Report prepared by Mark R. Denno, PE and Todd E. Horowitz, PE with Mellick-Tully and Associates, PC of South Bound Brook, New Jersey dated May 17, 2011. o A Custom Soil Resource Report for the PSE&G West Orange Switching Station from the United States Department of Agriculture Natural Resources Conservation Service dated December
dated May 17, 2011. o A Custom Soil Resource Report for the PSE&G West Orange Switching Station from the United States Department of Agriculture Natural Resources Conservation Service dated December 8, 2022. e¢ AMay 15, 2024 letter from Noreen Merainer, PP, PMP to the West Orange Zoning Board of Adjustment which provides details of the project scope, sets forth the requested variances and lists the required outside agency approvals. ‘S:\West Orange\Zoning Board\t 15 WRZ0155 V04 - PSE&G Company\24-09-09 Review #2 docx a
File revisions (1)
- Sep 29, 2026
f9f2c3e72f77525,619 bytes