Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 10

Show all pages
Page 10

Page 10 1 I believe we finished the questioning by Mr. Malanga 2 and at that point we concluded the hearing but did 3 leave it open if there were other members of the 4 public who did have any questions for him. 5 We do intend on calling however many 6 witnesses we can get through this evening. We do 7 have four present. We have our civil engineer, 8 Michael Blake, who will testify first after we get 9 done with the public comment -- or public questions, 10 rather, for Mr. Briones. 11 After Michael Blake we intend to call our 12 electrical engineer who will specifically discuss 13 lighting at this site, the electrical aspects of the 14 nature of the proposed improvements, as well as the 15 lightening masts feature of this site design. 16 Next we will have John Futey. He is a 17 landscape architect. He will get into the very 18 specific details in terms of our tree removals as 19 well as our proposed landscaping plan. And we do 20 have a colored rendering that we can provide to 21 fully walk the Board through both the removal as 22 well as the significant amount of restoration that 23 will be occurring at the site. 24 And then, lastly, we, of course, have our 25 planner who also was responsible for preparing the

File revisions (1)