Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 100

Show all pages
Page 100

Page 100 1 MS. MALANGA: Right. There's a 2 contradiction between what the experts are actually 3 doing here and what the mission is of the entire 4 corporation. I think that should be brought to the 5 attention -- 6 MS. PORTER: Objection. 7 ACTING CHAIR SCHWARZBAUM: That's -- 8 That's not relevant here. Go ahead. It's 9 specifically regard -- related to this application. 10 PSE&G is not on -- is not -- it's not part of the 11 mission statement. They also have a mission 12 statement on providing electricity. So ask the next 13 question. 14 MS. MALANGA: The 8-foot fence, is it not 15 a detriment to the character of the neighborhood? 16 THE WITNESS: That's an opinion. And I'm 17 not here -- I'm here to testify on stormwater 18 management design and how we developed the site. 19 MS. MALANGA: Okay. Well, Mr. Blake, I 20 hope you all just keep in mind the current issues in 21 West Orange: Loss of tree canopy and extensive 22 flooding. 23 Thank you very much. 24 ACTING CHAIR SCHWARZBAUM: Next resident. 25 MEETING MODERATOR: Yes. We have no more

File revisions (1)