Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 103
Show all pagesPage 103 1 Am I right? 2 A. Correct. 3 Q. Whether this change in flow from east to 4 west can be accommodated by the existing system? 5 A. Yes, because we actually reduced the 6 amount of flow that was going to the existing system 7 and routed some of it to the bioretention so that we 8 would not affect any of the current drainage system 9 in place. 10 Q. And you routed it to the basins by virtue 11 of regrading? 12 A. Yes. 13 Q. All right. And can you please continue 14 with regard to the stormwater flows on the site? 15 A. Once you get to the southern portion of 16 the pad, this site -- once you get past the existing 17 foundations, this area is -- there's going to be no 18 change. These foundations and this equipment is 19 staying intact and operational during construction. 20 But south of that this area will drain back towards 21 these various bioretentions. There's smaller 22 drainage areas that drain to each individual 23 basin. And then, once you get about halfway down 24 the switchgear, this portion of the pad starts to 25 shift and drain towards the southern basins.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes