Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 19, 2024

9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript

Preserved file SHA-2566c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25

Indexed text · page 107

Show all pages
Page 107

Page 107 1 record for the electrical plan drawings. 2 Q. Okay. Thank you. 3 ACTING CHAIR SCHWARZBAUM: Any members of 4 the Board have questions in regard to 5 qualifications? 6 Mike, you have any? You're good? 7 Okay. We'll admit Mr. Copa as an expert 8 in electrical engineering. Proceed. 9 THE WITNESS: All right. 10 BY MS. PORTER: 11 Q. Mr. Copa, can you please begin by 12 describing the new construction and layout? 13 A. Yes. So, yes, I will begin by sharing my 14 screen here. I will start out by sharing page 15 number 1 of the M-3 development plans, the civil 16 plans. It is the 230/26 to 4kV outdoor substation 17 key plan dated 4/22/2024. And this was submitted as 18 part of the initial application. 19 So as stated previously by Mr. Briones and 20 Mr. Blake, the existing 26 kV equipment at West 21 Orange will be demolished and replaced with a new 26 22 kV 24-circuit shelter aisle switchgear. The West 23 Orange substation is an existing 230/26 to 4 kV 24 substation. The project will not modify any of the 25 230 or 4 kV equipment. It will only be upgrading

File revisions (1)