Supporting Documentation · Sep 19, 2024
9 12 24 West Orange BOA ZB 24 06 PSEG Full size Transcript
6c58176aa60fae5a47a34b55ed66c2cb7171518bbe61496e53e0f4744431dd25Indexed text · page 108
Show all pagesPage 108 1 the existing 26 kV equipment. 2 The 26 kV shelter aisle switchgear will be 3 connected to the existing 230 to 26 kV power 4 transformers via overhead bus. 5 The switchgear unit was placed on-site to 6 allow for a sequence of construction that supports 7 the station while remaining fully in service during 8 the entirety of construction. And while this 9 particular site is not within a flood zone, the new 10 equipment is a new, modern sheltered equipment 11 making it hardened against severe weather. 12 In addition, the 26 kV circuits to the new 13 switchgear will remain as underground circuits. The 14 majority of the new equipment is installed within 15 the switchgear that is approximately 14 feet in 16 height. 17 I will now move forward to page number 2 18 of the same M-3 development plan exhibits. This 19 file is the 26 kV outdoor substation sections, Sheet 20 Number 1 dated 4/22/2024. 21 So as stated, the new switchgear is 22 approximately 14 feet in elevation, and the majority 23 of the new equipment that is connecting the new 24 equipment to our existing equipment is less than 30 25 feet in height.
File revisions (1)
- Sep 29, 2026
6c58176aa60f716,537 bytes